Rajasthan Electricity Regulatory Commission (Standards of Performance of Transmission Licensee) Regulations, 2021
RegulationDated 3 Feb 2021No. RERC/Secy/Reg – 140 dated February 3, 2021
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Rajasthan Electricity Regulatory Commission issued this notification (No. RERC/Secy/Reg – 140, Jaipur, February 3, 2021) to replace its 2004 transmission standards-of-performance regime with a new set of performance norms binding every intra-State transmission licensee in Rajasthan. It takes effect from the date of publication in the official gazette, which is not printed in the text (p19).
Regulations 1–4 set the title, commencement, definitions and scope. The obligations sit in Regulation 5, which names three standards — availability, SAIFI/SAIDI, and restoration time — and makes them minimum levels the licensee must achieve, while also requiring compliance with CEA (Grid Standards) Regulations, 2010 (p21).
Regulation 6 is the technical core: it sets element-wise monthly availability floors by equipment category, prescribes how availability is computed for AC and HVDC systems (which elements count, weightage factors, deemed-available outages) and how SLDC certifies it (p22–26). Regulation 7 defines how SAIFI and SAIDI are calculated monthly per voltage class and sets the ceilings they must not exceed (p26–27). Regulation 8 fixes maximum restoration times by failure type and terrain (p27–28).
Regulations 9–10 create the enforcement mechanism: an affected person may petition for compensation, capped at 1.5 times the applicable transmission charges, with a 90-day filing window and no pass-through to users (p28–29). Regulations 11–13 set SLDC certification timelines, reporting and website-display duties, and annual review by the State Power Committee (p29–30). Regulations 14–17 cover force majeure relaxation, removal of difficulties, amendment power, and repeal of the 2004 regulations with a savings clause (p30–31). Schedules A and B give the reporting formats (p31–33).
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read RERC's website for final documents on 24 Nov 2026. A document RERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of RERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.