Skip to content

RERC · Rajasthan Electricity Regulatory Commission

Standards of Performance of Transmission Licensee Regulations, 2021

Rajasthan Electricity Regulatory Commission (Standards of Performance of Transmission Licensee) Regulations, 2021

RegulationDated 3 Feb 2021No. RERC/Secy/Reg – 140 dated February 3, 2021

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on rerc.rajasthan.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Rajasthan Electricity Regulatory Commission issued this notification (No. RERC/Secy/Reg – 140, Jaipur, February 3, 2021) to replace its 2004 transmission standards-of-performance regime with a new set of performance norms binding every intra-State transmission licensee in Rajasthan. It takes effect from the date of publication in the official gazette, which is not printed in the text (p19).

Regulations 1–4 set the title, commencement, definitions and scope. The obligations sit in Regulation 5, which names three standards — availability, SAIFI/SAIDI, and restoration time — and makes them minimum levels the licensee must achieve, while also requiring compliance with CEA (Grid Standards) Regulations, 2010 (p21).

Regulation 6 is the technical core: it sets element-wise monthly availability floors by equipment category, prescribes how availability is computed for AC and HVDC systems (which elements count, weightage factors, deemed-available outages) and how SLDC certifies it (p22–26). Regulation 7 defines how SAIFI and SAIDI are calculated monthly per voltage class and sets the ceilings they must not exceed (p26–27). Regulation 8 fixes maximum restoration times by failure type and terrain (p27–28).

Regulations 9–10 create the enforcement mechanism: an affected person may petition for compensation, capped at 1.5 times the applicable transmission charges, with a 90-day filing window and no pass-through to users (p28–29). Regulations 11–13 set SLDC certification timelines, reporting and website-display duties, and annual review by the State Power Committee (p29–30). Regulations 14–17 cover force majeure relaxation, removal of difficulties, amendment power, and repeal of the 2004 regulations with a savings clause (p30–31). Schedules A and B give the reporting formats (p31–33).

Standard name
Standards of Performance
Primary topics
Standards of performance, Transmission availability and outages

Read with this

No other documents to read with it are on Voltaic.

Voltaic last read RERC's website for final documents on 24 Nov 2026. A document RERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of RERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on rerc.rajasthan.gov.in ↗

Report an issue with this document