MERC · Maharashtra Electricity Regulatory Commission
Specific Conditions of Distribution Licence for LBSCML FTWZ and IT/ITES SEZ, 2019 — First Amendment, 2026 — Statement of Reasons
Maharashtra Electricity Regulatory Commission (Specific Conditions of Distribution Licence applicable to Laxmipati Balaji Supply Chain Management Ltd. for FTWZ and IT/ITES SEZ at Village Sai, Taluka Panvel, Dist. Raigad) (First Amendment) Regulations, 2026
Statement of reasonsDated 19 Jun 2026
The commission's reasons for the Specific Conditions of Distribution Licence (Laxmipati Balaji Supply Chain Management Ltd., FTWZ and IT/ITES SEZ, Raigad) Regulations, 2019 or one of its amendments.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This two-page document is MERC's Statement of Reasons for the First Amendment to the Specific Conditions of Distribution Licence applicable to Laxmipati Balaji Supply Chain Management Ltd. (LBSCML) for the FTWZ and IT/ITES SEZ at Village Sai, Taluka Panvel, Dist. Raigad (p1). It records why the amendment is being made; it does not reproduce the amended regulation text.
The background is that LBSCML was notified as a co-developer of the FTWZ and IT/ITES SEZ by the Ministry of Commerce and Industry and is, under Section 14 of the Electricity Act, 2003, a deemed Distribution Licensee for that area, with specific licence conditions notified by MERC on 26 February 2019 (p1). The company informed the Commission by letter dated 19 September 2025 that its name had changed to Iskandar Power Limited, following a Certificate of Incorporation dated 19 December 2024 and approval dated 4 September 2025 from the Office of the Development Commissioner, SEEPZ, Mumbai (p1). The amendment exists solely to carry that name change into the existing specific conditions regulations (p1).
The draft amendment was published in two English and two Marathi newspapers on 21 February 2026 and placed on the Commission's website, with comments due by 23 March 2026 (p1). Two objectors responded; the Commission found their comments unrelated to the draft and instead directed at a separate suo-motu draft order on renewable energy tariff for FY 2026-27 (p1–2). It therefore concluded that no change to the draft was required and finalised the amendment (p2). The SoR carries no gazette date or commencement date.
Read with this
The regulation
Amendments and corrections
Commencement notices and reasons
3 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft not held as English text.
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.