UPERC · Uttar Pradesh Electricity Regulatory Commission
Verification of Generating Plants and Captive Consumers (Repeal) Regulations, 2026
Uttar Pradesh Electricity Regulatory Commission (Verification of Generating Plants and Captive Consumers)(Repeal) Regulations, 2026
RegulationDated 5 Aug 2026In force from 1 Apr 2026UPERC/SECY/REGULATION/2026-018 dated August 5, 2026
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a three-page UPERC regulation that switches off the Commission's 2022 captive-verification regime and defers to the new central framework. The recitals (p2–3) explain why: the Centre's Electricity (Amendment) Rules, 2026 [G.S.R. 186(E) dated March 13, 2026] substituted Rule 3 of the Electricity Rules, 2005 with a fresh captive generating plant regime — wider concepts of "captive user" (including consumption through Energy Storage Systems) and "ownership" (including group entities), SPVs treated as Associations of Persons, proportionate consumption limits for individual captive users, and verification through a State-designated nodal agency, with a Grievance Redressal Committee to hear appeals. Those amended Rules took effect on March 13, 2026, except Rule 3(2)(d)(ii)–(iii) and Rule 3(4), which take effect from April 1, 2026 (p3).
The operative part is three clauses. Clause 1 gives the title and makes the Regulations applicable from April 1, 2026 — a date earlier than the notification itself (p2–3). Clause 2 repeals the UPERC (Verification of Generating Plants and Captive Consumers) Regulations, 2022 from that date (p3). Clause 3 preserves past verification: verification of generating plants and captive consumers in Uttar Pradesh up to the financial year ending March 31, 2026 continues under the repealed Regulations, and the effect of repeal under s.6 of the General Clauses Act, 1897 is preserved (p3).
The regulation creates no successor procedure, declaration format, nodal agency or GRC itself; on its own recitals those are for the State Government to put in place under the amended Rule 3(4) (p3). It is signed by the Commission's Secretary (p3).
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read UPERC's website for final documents on 24 Nov 2026 (2 pages). A document UPERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of UPERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.