HERC · Haryana Electricity Regulatory Commission
Framework for Resource Adequacy Regulations, 2024
Haryana Electricity Regulatory Commission(Framework for Resource Adequacy) Regulations, 2024
RegulationDated 11 Nov 2024Published in the Gazette 19 Nov 2024HERC/61/2024 dated The 11th November, 2024
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is HERC's principal regulation creating a state resource adequacy (RA) framework, notified as Regulation No. HERC/61/2024 and printed in the Haryana Government Gazette of 19 November 2024, the notification being dated 11 November 2024 (p1). It is made under section 181 of the Electricity Act 2003, follows previous publication, and comes into force from the date of notification in the Official Gazette (p1).
It applies to generating companies, distribution licensees, the State Load Dispatch Centre, the State Transmission Utility and other grid-connected entities in Haryana (p1). Clauses 1–4 give the title, extent, commencement and objective, and fix the vocabulary — capacity credit, EENS, NENS, LOLP, planning reserve margin, net load, the LT/MT/ST-DRAP family, RA Guidelines and Bidding Guidelines (pp2–3).
Chapter 2 (clauses 5–7, pp4–6) sets out the framework in four steps — demand assessment and forecasting, generation resource planning, procurement planning, monitoring and compliance — and defines the planning horizon. It requires the distribution licensee to build category-wise energy and demand forecasts using prescribed modelling methods, policy and driver trajectories and scenario analysis, with STU and SLDC aggregating to state level on an annual calendar.
Clauses 8–12 (pp7–9) cover generation resource planning: mapping existing, upcoming and retiring resources; computing capacity credit factors, including a net-load method for wind and solar using the highest-demand hours of the past five years; deriving the planning reserve margin from reliability indices; identifying the resource gap; and preparing LT-DRAP, MT-DRAP and ST-DRAP for CEA validation and Commission approval on stated timelines.
Clauses 13–17 (pp10–11) cover procurement planning: least-cost optimal resource mix, RE procurement under HERC's 2021 RE/RPO/REC regulations, storage contracting under MoP bidding guidelines, procurement tenure and region-first optimisation, capacity sharing, and prior Commission approval of new capacity tie-ups and long/medium-term PPAs and PSAs. Clause 18 (p12) covers monitoring, reporting of state-aggregated capacity shortfall and case-by-case non-compliance charges; clauses 19–20 (p13) set the data-sharing protocol and annual timelines; clauses 21–23 (p14) give the Commission powers to direct, relax and remove difficulties.
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read HERC's website for final documents on 24 Nov 2026 (2 pages). A document HERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of HERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.