Maharashtra Electricity Regulatory Commission (Specific Conditions of Distribution Licence applicable to M/s EON Kharadi Infrastructure Pvt. Ltd. for the IT and ITES SEZ at MIDC Knowledge Park, Survey No.77, Kharadi, Pune (EON SEZ Phase I)) Regulations, 2021
RegulationDated 9 Jun 2021MERC/TEC/ Licence Conditions/ EON Phase I/2021/ 0263 dated 9th June 2021
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a MERC gazette notification that sets the licence conditions for one deemed distribution licensee — M/s EON Kharadi Infrastructure Pvt. Ltd. — which supplies electricity inside EON SEZ Phase I at MIDC Knowledge Park, Kharadi, Pune (p5). Made under s.181(2)(d) read with s.16 and s.14(b) of the Electricity Act 2003 (p5), it takes the General Conditions of Distribution Licence Regulations, 2006, as in force from time to time, and deems them, together with these specific conditions, to be EON's licence conditions (Reg 3, p6).
Regulation 1 gives the title, extent and commencement: the Regulations extend to the area in the Government of India SEZ notification (S.O.1631(E) dated 28 September 2006, from which the licence term is also counted) and come into force on publication in the Official Gazette (p5). Regulation 2 defines Act, Developer, Deemed Distribution Licensee — EON, authorized under s.14(b) of the Act by GoI notification SO 528(E) dated 3 March 2010 under s.49 of the SEZ Act 2005 — General Conditions, EON and SEZ Act/Rules (pp5–6).
Regulation 4 fixes the area of supply by reference to the SEZ notification under s.4 of the SEZ Act 2005, with the delineated map at Schedule I, and requires EON to approach the Commission within 15 days of any future SEZ notification or de-notification to amend these conditions; on de-notification it must keep supplying until alternative supply is arranged (pp6–7). Regulation 5 sets the term — twenty-five years from 28 September 2006, expiring 27 September 2031 unless revoked earlier. Regulations 6–9 require public inspection of the conditions and licence, 24-hour uninterrupted supply, and reserve the Commission's powers to amend and to remove difficulties (p7). Schedule I holds the area map (p8).
Read with this
Commencement notices and reasons
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of MERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.