Skip to content

AERC · Assam Electricity Regulatory Commission

Procedure for filing Appeal before the Appellate Authority Regulations, 2017 — Statement of Objects and Reasons

Assam Electricity Regulatory Commission (Procedure for filing Appeal before the Appellate Authority) Regulations, 2017

Statement of reasonsDated 9 Nov 2017AERC 636/2017/31 dated 09.11.2017

The commission's reasons for the Procedure for Filing Appeal before the Appellate Authority Regulations, 2017.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on aerc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Statement of Objects and Reasons behind the AERC (Procedure for filing Appeal before the Appellate Authority) Regulations, 2017 — a record of why the Commission drafted the appeal procedure the way it did and what it refused to change. The operative regulation text is not reproduced.

Paragraph 1 sets out the statutory backdrop: s.127(1) of the Electricity Act 2003 gives a person aggrieved by a final order under s.126 thirty days to appeal to an Appellate Authority constituted by the State Government under the Appeal to the Appellate Authority Rules, 2004, and the Commission used its s.181(2)(zo) powers to frame the draft regulations (p1). The draft was notified for comments on 21 August 2017 with a 22 September 2017 deadline; two stakeholders responded — APDCL and the Assam Branch Indian Tea Association (ABITA) — and a public hearing was held on 09.11.2017 (p1–2).

Paragraph 2 works through ABITA's objections one by one with the Commission's reasoning: the categories of assessment (malpractice, excess load, theft) belong to the Supply Code; the Assessing Officer is designated by the State Government under s.126 and need not appear in these regulations; consumer consent and pre-bill rights are unnecessary because inspections are meant to be surprise inspections; and the requirement to deposit half the assessed amount before appealing is mandatory under s.127(2) and cannot be relaxed by the Commission (p2–3).

Paragraphs 3 and 4 thank the stakeholders and direct that the draft be finalized and notified in the Official Gazette (p3). A closing annexure lists the APDCL, ABITA and AERC personnel who attended the hearing (p4).

Standard name
Appeal Procedure (Appellate Authority)
Primary topics
Appeals to the appellate authority, Theft and unauthorised use

Read with this

Voltaic last read AERC's website for final documents on 30 Sep 2026. A document AERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on aerc.gov.in ↗

Report an issue with this document