KERC · Karnataka Electricity Regulatory Commission
Consumer Grievance Redressal Forum and Ombudsman Regulations, 2004 — Third Amendment, 2025
Karnataka Electricity Regulatory Commission (Consumer Grievance Redressal Forum and Ombudsman) (Third Amendment) Regulations, 2025
AmendmentDated 20 May 2025KERC/DDD/CGRF/1254/2025-26/ 209 dated 20.05.2025
Amends the Consumer Grievance Redressal Forum and Ombudsman Regulations 2004.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Karnataka Electricity Regulatory Commission issued this Third Amendment to its 2004 Consumer Grievance Redressal Forum and Ombudsman Regulations, with the notification dated 20.05.2025 (p1). The preamble records that distribution licensees (ESCOMs) asked for additional CGRFs; district-level CGRFs already exist in every revenue district; and KERC had already used its removal-of-difficulties power to order on 19.11.2024 that licensees may set up additional CGRFs at corporate offices. A draft amendment was notified on 16.01.2025, comments were invited, and a public hearing was held on 19.03.2025 (p1).
Regulation 1 names the amendment, says it commences on publication in the Karnataka Official Gazette, and applies to all electricity distribution licensees and consumers in Karnataka (p1–2). Regulation 2 sets out a substitution/insertion table (p2–4).
The table introduces a definition of “Prosumer” — a person who consumes from the grid and can also inject into the grid at the same supply point (p2); broadens the qualifications for the Commission-nominated forum member to include law (p2); and inserts clause 3.2.1 requiring every distribution licensee to establish a corporate-level CGRF alongside existing district forums, with a prescribed composition including a Chief Engineer chairperson, a Superintending Engineer, a licensee-nominated prosumer representative and one more member (p2–3). It also touches member sitting fee, DA and TA (p3), the complaint-lodging and redressal procedure including condonation of delay (p3–4), and the findings/remedy clause, updating the cross-reference to the KERC 2022 SoP Regulations and allowing a complainant aggrieved by a corporate-level CGRF order to approach the Ombudsman within thirty days (p4).
Read with this
The regulation
- Dated 12 May 2004Consumer Grievance Redressal Forum and Ombudsman Regulations 2004
Amendments and corrections
Earlier drafts
One more document belongs here and is not on Voltaic: a copy in another language.
Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.