The Nagaland Electricity Regulatory Commission issued these Demand Side Management Regulations on 2 August 2019 under the Electricity Act 2003, s.181(2)(zp). They apply to distribution licensees in Nagaland and come into force on Gazette notification, though the Gazette date is not printed (p4–5).
Chapter I gives the short title, extent and commencement, and defines the DSM vocabulary the rest of the instrument uses: baseline data, avoided costs, cost-effectiveness index, DSM resource acquisition, ESCOs, EM&V, load management and load research (p4–7). Chapter II sets DSM objectives and guiding principles, requires the Commission to set DSM targets and issue process guidelines, and directs licensees to assess technical DSM potential using BEE methodology before each MYT control period (p7–10). Chapter III requires every distribution licensee to constitute a DSM Cell and assigns it load research, plan formulation, project design, approvals, implementation and related functions (p10). Chapter IV lays out the DSM process: load and market research and baseline data, formulation and approval of a perspective DSM Plan and rolling annual plans, programme documents and prior Commission approval, implementation, cost-recovery conditions, monitoring and reporting, and third-party evaluation, measurement and verification (p10–14). Chapter V requires six-monthly progress reports and a programme completion report (p14–15). Chapters VI–IX deal with funding through the ARR and tariff, multi-year and annual DSM budgets, separate budget approval for DSM activities outside plan implementation, and spending on consumer awareness, audits and equity considerations (p15–18). Chapter X is miscellaneous, covering Commission powers to amend, remove difficulties, issue orders and practice directions, and decide disputes (p18). The regulation creates a framework and leaves most operational detail to future Commission guidelines.
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read NERC's website for final documents on 1 Oct 2026. A document NERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of NERC's website on 1 Oct 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.