Cost Data Book for Recovery of Expenses & Other Charges from Prospective Consumers, 2016

COST DATA BOOK FOR RECOVERY OF EXPENSES & OTHER CHARGES FROM PROSPECTIVE CONSUMERS FOR TAKING ELECTRIC SUPPLY

ManualIn force from 3 Mar 2016

1 amendment to it is on Voltaic.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on uperc.org ↗

Summary

Summary written by software, from pages 1 to 46 of 60. Check the regulator's original before you rely on it.

The UPERC Cost Data Book 2016 fixes the charges that distribution licensees in Uttar Pradesh may recover from applicants for new electricity connections, load enhancement and related services. The Commission's Statement of Objects and Reasons (pp3–5) grounds the book in Sections 42, 46 and 47 of the Electricity Act 2003 and the UP Electricity Supply Code 2005, and states that the total charge has four components—processing fee, security, system loading charge and line charge—each to be shown separately in estimates and receipts. It also sets conversion factors, an inconsistency rule giving the Cost Data Book precedence over the Supply Code, installment options for connection charges up to 2 kW, and a prepaid-meter installment route (p5).

Chapter 2 (p6) sets processing fees by sanctioned or contracted load bands from BPL 1 kW up to above 10,000 kVA; the fee is non-refundable and applies to new connections, temporary and Tatkal connections, load reduction/enhancement, mutation and shifting. Chapter 3 (pp7–9) prescribes security amounts by consumer category and load, with notes on prepaid meters, BPL and departmental consumers, temporary connections, load enhancement, adjustment against dues after permanent disconnection, interest, and bank-guarantee payment thresholds and penalties. Chapter 4 (pp10–11) lays down system loading charges by load and voltage, explains the reduction for loads above 10,000 kVA and treatment of 132 kV and above, and sets rules for temporary connections, builders/promoters, and load enhancement at the same or a higher voltage.

Chapters 5 and 5A (pp12–17) give overhead and underground line charges: a fixed charge for line up to 40 metres and a variable charge beyond 40 metres, by load band and voltage and according to whether the licensee or consumer provides the line and meter. The notes at pp17–18 cover cable and meter-board responsibility, point of supply, enhancement and shifting, independent feeder charges, group connections, temporary connections, employee exemption, refunds on withdrawal, railway crossings, and the effective date 03.03.2016 with a transition for connections not released by then.

The remaining pages supply the cost build-up. Annexure 1 (pp19–20) analyses system-upgradation expenditure for LT, secondary and primary substations and justifies the system loading charges. Annexure 2 (pp21–25) calculates security amounts for each category from assumed load, load factor and tariff. Annexures 3–26 (pp26–44) are fixed line-charge worksheets for private tube wells and load bands from village 2 kW up to above 4–10 MVA, separately for overhead and underground services. Annexures at pp45–46 calculate per-metre cost of LT single- and three-phase lines on ST and PCC poles. The index (p2) lists Annexures 1–29 at pp18–59.

Standard name
Recovery of Expenditure and Miscellaneous Charges, Electricity Supply Code
Primary topics
Connection and miscellaneous charges, New connections and load changes, Security deposit

Read with this

Voltaic last read UPERC's website for final documents on 24 Nov 2026 (2 pages). A document UPERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of UPERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on uperc.org ↗

Report an issue with this document