Skip to content

CERC · Central Electricity Regulatory Commission

Exchange of Energy Savings Certificates Regulations, 2016

Central Electricity Regulatory Commission (Terms and Conditions for Exchange of Energy Savings Certificates ) Regulations, 2016

Draft regulationDated 3 Feb 2016No L-1/97/2016 dated the 03rd February , 2016

Draft

A proposal, not law. Voltaic holds no final regulation made from this draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a CERC notification making the Central Electricity Regulatory Commission (Terms and Conditions for Exchange of Energy Savings Certificates) Regulations, 2016, to create a power-exchange market for Energy Savings Certificates (ESCerts) issued under the PAT scheme of the Energy Conservation Act. It is framed for publication in the Gazette of India, Extraordinary (p1).

Regulation 1 gives the title and provides that the regulations take effect on publication in the Official Gazette (p1). Regulation 2 defines the working vocabulary — Act, Bureau/Administrator, Commission, Cycle, Designated Consumer, EC Act, Eligible entity, Energy Conservation Rules, ESCerts, exchange or trade, Market, MoP, Power Exchange, Power Market Regulations, POSOCO and Target Year — and imports undefined terms from the parent statutes and Ministry of Power rules (p2–4). Regulation 3 states the objective: a framework for exchange of ESCerts on power exchanges; Regulation 4 fixes scope to ESCerts offered for transaction on power exchanges, including contracts approved by the Commission (p4). Regulation 5 makes POSOCO the Registry. Regulation 6 lists the Commission's functions — approving interface procedures, monitoring exchange performance and issuing directions to the Bureau (p4). Regulation 7 lists the Administrator's (Bureau's) functions: interface procedures, dissemination of market information, ensuring transparent exchange, and a detailed procedure covering registration, exchange, transfer, banking and extinguishment of ESCerts (p5).

Regulations 8–10 carry the market design: how ESCert contracts are denominated and categorised by year of issue and cycle, who may trade (designated consumers that over- or under-achieved their specific energy consumption targets, plus other entities permitted by the Commission), and how dealing works — registration with the Registry and the exchange, frequency of exchange, exchange rules and byelaws requiring prior Commission approval, sale-bid limits against Registry balances, Registry cross-checking and defaulter treatment, post-trade settlement and account updating, and a closed-bid double-sided auction (p5–8). Regulation 11 covers denomination and price discovery; Regulation 12 leaves fees and charges to a later order; Regulation 13 provides for market oversight in consultation with the Bureau; Regulations 14 and 15 give relaxation and direction powers (p9–10).

Primary topics
Energy saving certificates, Power markets and exchanges

Read with this

Voltaic holds no final regulation made from this draft.

Proposed changes (drafts with no final yet)

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document