Licensee's Duty for Supply of Electricity on Request Regulations, 2004

Himachal Pradesh Electricity Regulatory Commission (Licensee's Duty for Supply of Electricity on Request) Regulations, 2004

RegulationDated 21 Jun 2004No: HPERC/____ dated the 21st June, 2004

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Himachal Pradesh Electricity Regulatory Commission issued these regulations at Shimla on 21 June 2004 under s.181(1) read with s.43(1) of the Electricity Act, 2003 (p1). They bind all distribution licensees in their respective licensed areas in Himachal Pradesh and come into force on publication in Rajpatra, Himachal Pradesh; the Gazette date itself is not printed (p1).

Regulation 2 defines the terms the rest of the instrument turns on: the Act, the adjudicating officer, the applicant (owner or occupier applying for supply), the Commission, and consumer categories fixed by supply voltage — LT, HT and EHT — plus 'month' as both calendar month and the roughly 30-day billing interval between meter readings (p1–2).

Regulation 3 is the operative core. On receiving an application the licensee must send a demand notice by registered/speed post within category-specific periods, stating the deficiencies and codal formalities to be made good, the wiring test report requirement, and the exact charges and security payable (p2). Supply timelines then run from completion of formalities and payment of charges and security: about twenty days where no mains extension or new substation is needed; a longer category-specific period where extension of mains or commissioning of a substation is needed but no new 33/11 kV substation is involved; and, where a new 33/11 kV substation is required, a route in which the licensee files a proposal with the Commission within fifteen days and the Commission fixes the commissioning period after hearing both sides (p3). Where the substation is already in the Commission-approved investment plan, that plan's timeline governs (p4). Regulation 3(4) excuses delay for right of way, land acquisition, Chief Electrical Inspector approval of HT/EHT installations and similar causes beyond the licensee's control, with disputes decided by the Commission. Regulation 3(5) makes the licensee responsible for commercial arrangements with transmission licensees to make EHT supply available; 3(6) covers supply in previously un-electrified villages and habitations per the approved investment plan (p4).

Regulation 4 makes failure to meet the Regulation 3 time frames penal under s.43(3), without absolving the licensee of compensation under s.57(2). Regulations 5 to 8 cover force majeure, interpretation by the Commission, issue of orders and practice directions, and power to remove difficulties, including that orders under that power are laid before the State Legislative Assembly (p4–5).

Standard name
Duty to Supply on Request
Primary topics
Conditions of supply, New connections and load changes, Rural electrification

Read with this

No other documents to read with it are on Voltaic.

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of HPERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on hperc.org ↗

Report an issue with this document