Skip to content

HPERC · Himachal Pradesh Electricity Regulatory Commission

Treatment of Income of Other Businesses of Transmission Licensees and Distribution Licensees (First Amendment) Regulations, 2023

Himachal Pradesh Electricity Regulatory Commission (Treatment of Income of Other Businesses of Transmission Licensees and Distribution Licensees) (First Amendment) Regulations, 2023

AmendmentDated 15 May 2023HPERC/420- dated 15th May, 2023

Amends the Treatment of Income of Other Businesses of Transmission Licensees and Distribution Licensees Regulations, 2005.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Himachal Pradesh Electricity Regulatory Commission issued this first amendment to its 2005 Regulations on the treatment of income from the "other businesses" of transmission and distribution licensees, notified at Shimla on 15 May 2023 (p1). It takes effect on publication in the Rajpatra, Himachal Pradesh; that date is not printed, and the parent Regulations are noted as having been published in the Rajpatra on 12 January 2006 (p1).

Regulation 2 tightens Regulation 3 of the parent text. Licensees must tell the Commission the nature and extent of any use of their transmission or distribution assets for a business other than the licensed business, and the expected annual revenue from it (p1). The substituted Regulation 3(5) places the entire cost and risk of permitting such use on the licensee and makes it absolutely responsible for ensuring that the licensed business's performance, the safety of assets and personnel, and quality of service are not adversely affected — with compliance measured against a roll-call of CEA safety regulations, HPERC performance standards and the State's grid, supply and distribution codes (pp1–2).

Regulation 3 inserts a new Regulation 4A creating a special regime for renting transmission or distribution assets to telecommunications companies (p2). It sets out what a rent agreement must cover, the structure and permitted length of terms and extensions, protection against a term outliving either party's licence, automatic annual rent escalation with review at each extension, and notice periods for breach and termination (p2). It caps how much of a licensee's assets in a circle may go to a single telecom company together with its sister concerns, requires a transparent letting process, and routes rental income into the tariff order as non-tariff income (pp2–3). A new proviso to Regulation 5(4) fixes the share of annual rental income (excluding taxes) that is taken into the ARR (p3).

Regulation 4A(5) additionally lets a distribution licensee serve a telecom company's several connection points in one Operation Circle under a single common connection agreement, with each point identified by coordinates, pole/tower, transformer or substation, and metering and billing done at each point of supply (p3).

Standard name
Other Business Income
Primary topics
Business separation and other business, Operating costs and other income, ARR and true-up

Read with this

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on hperc.org ↗

Report an issue with this document