Renting/Leasing Out of Discom Assets for Other Business (Telecommunication Network) Regulations, 2022 — Revised Draft

Meghalaya State Electricity Regulatory Commission (Renting/Leasing Out of the Discom assets for other Business such as Facilitation of Telecommunication Network) Regulations, 2022.

Draft regulationDated 9 Dec 2022MSERC/FoTN/Regulation/2022/197 dated 9

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on mserc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a revised draft regulation of the Meghalaya State Electricity Regulatory Commission, issued under its letter No. MSERC/FoTN/Regulation/2022/197 of 9 December 2022, that would govern how Meghalaya's distribution licensees rent or lease their assets — principally poles and office buildings — to telecom companies for installing telecommunication networks, including 5G (p1). It extends to the whole State, applies to distribution licensees and franchisees, and would take effect on publication in the Official Gazette, whose date is not printed (p1).

Clause 2 supplies the working vocabulary: distribution assets, the distinction between telecom service providers and infrastructure providers, franchisees, gross revenue from the telecom business, and the metering arrangement under which telecom consumption on Discom assets is measured at the point of installation (p1–3). Clause 3 requires the licensee to disclose its telecom renting business annually through the ARR — assets used, impact on the licensed business, revenue earned — and makes the licensee absolutely responsible for ensuring that renting does not degrade its service obligations (p3–4).

Clause 4 is the operative core: it permits renting of distribution assets and related services, fixes the term and annual extension of the rental agreement, requires assignment through a transparent first-come-first-serve process within territorial divisions, conditions access on weight-bearing capacity and ground clearance, adopts the implementation procedure in the Meghalaya Telecom Infrastructure Policy 2018, requires smart/prepaid metering and billing at each point of installation at the telecom company's cost, classifies rental income as non-tariff income in ARR filings, and lists conditions the licensee must never breach (p4–6). Clause 5 fixes how gross rent is split between the licensee's retention and its non-tariff income, with separate accounts (p6).

Clauses 6 to 10 are machinery: the Commission's inherent powers and power to remove difficulties, penalty for illegal use and for violation of the 2018 Telecom Policy, power to amend, state- and district-level dispute resolution committees modelled on the Policy, and a savings clause overriding the MYT Regulations 2014 treatment of rental non-tariff income (p6–7).

Standard name
Telecom Network Facilitation
Primary topics
Business separation and other business, Operating costs and other income, Metering

Read with this

Voltaic last read MSERC's website for final documents on 26 Nov 2026 and for drafts on 21 Nov 2026. A document MSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on mserc.gov.in ↗