This is the Bihar Electricity Regulatory Commission's principal licensing instrument for intra-state transmission of electricity. It was notified on 5 April 2007, published in the Bihar Gazette Extraordinary dated 10 April 2007, and comes into force on that Gazette publication (p1). It is made under section 181 read with sections 15, 16 and 18 of the Electricity Act 2003 and extends to the whole of Bihar (p1).
Chapter 1 (p1–2) fixes title, extent and commencement and defines the working vocabulary — applicant, transmission licence and licensee, area of transmission, transmission system, generator, distribution licensee, auditors, the Commission — with a residual rule that undefined terms take their Electricity Act or general industry meaning.
Chapter 2 (p2–8) is the licensing procedure. It covers the application form, prescribed fee, six-set filing and affidavit; mandatory reference to the State Transmission Utility, which must report within 30 days on whether the assets form part of the intra-state transmission system and transmission plan; acknowledgement, further information and confirmation that the application is complete; publication of English and Hindi newspaper notices; public inspection; a 30-day objection window with a right of reply; and the Commission's choice between a hearing and a local inquiry. It then governs grant (with a pre-grant newspaper notice and a hearing before refusal), the licence's commencement and duration, deposit of maps and proformas, printing and public availability, amendment including suo motu amendment, contravention, revocation on stated grounds after enquiry with three months' notice, and deemed grant for persons already transmitting under repealed laws.
Chapter 3 (p8) carries savings preserving the Commission's power to depart from its own procedure, the power to remove difficulties and the power to amend.
Appendix I (p9–11) is the application form: applicant particulars, enclosures, five years of financial and turnover data, credit and default certificates, equity and debt arrangements, managerial capability and a five-year business plan. Appendix II (p12–26+) is the model licence: Part I grants it, without exclusivity and non-transferable, for a 25-year term; Part II sets general conditions on prohibited activities, prior consents, accounting, major-incident reporting, investment and asset-transfer approvals, licence fee and revocation; Part III sets technical conditions on planning, security and operating standards, grid code compliance and central despatch. Part III continues beyond them.
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read BERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document BERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of BERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.