TARIFF FILING FORMS (HYDRO) FOR DETERMINATION OF TARIFF PART-II Annexure-I
RegulationDate not stated
Summary
Summary written by software. Check the regulator's original before you rely on it.
Part-II Annexure-I is the hydro-specific tariff filing package for petitions before CERC. The cover title (p1) and checklist (pp2–4) identify it as the Part-II set of forms and supporting documents that a generating company must file for determination of tariff for hydro stations. It does not itself set tariff norms; it prescribes what information must be submitted and in what format, with year columns for the 2019-24 tariff period (p39).
The checklist lists Forms 1 to 19 and supporting documents such as audited balance sheets, loan agreements, approvals, PPA/BPSA, DPR, CPM/PERT charts, and justification for cost and time overruns (pp2–4). A note requires electronic copy in Word, calculations in Excel, upload on the e-filing website and submission on pen drive/flash drive (p4).
The forms then set out the data schedules. Form-1 summarises tariff (p5); Forms-1(I) and 1(II) show claimed capital cost and return on equity (pp6–10). Form-2 captures COD, station type, free power, LADF and normative parameters such as NAPAF (pp10–11). Form-3 records salient features and generation limitations (pp12–13). Forms-4 and 4A cover foreign loans and equity with exchange-rate details (pp14–16). The Form-5 series deals with admitted capital cost, cost break-ups, construction/supply/service packages, and cost or time overruns (pp17–33). Form-6 gives the financial package up to COD (p34). Forms-7 and 8 cover project-specific loans and allocation of corporate loans (pp35–38).
Forms-9A to 9F cover additional capitalisation after COD, de-capitalisation, reconciliation with books, exclusions, statements of capital cost and CWIP (pp39–47). Form-10 finances additional capitalisation (p48). Forms-11 and 12 calculate and state depreciation (pp49–50). The Form-13 series covers interest on actual and normative loans, working capital, non-tariff income and incidental expenditure during construction (pp51–56). Forms-14 and 14A provide the draw-down schedule for IDC/financing charges and actual cash expenditure (pp57–61). Month-wise design energy and peaking capability tables follow (pp62–65), then Form-16 liability flow (p66), Form-17 O&M expense (p67), Form-18 statutory charges (p68) and Form-19 summary of issues in the petition (p69). The text contains no notification number, gazette date or in-force clause.
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of CERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.