Skip to content

CERC · Central Electricity Regulatory Commission

Hydro Tariff Filing Forms, Part-II Annexure-I — 2019 Tariff Regulations

TARIFF FILING FORMS (HYDRO) FOR DETERMINATION OF TARIFF PART-II Annexure-I

RegulationDate not stated

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

Part-II Annexure-I is the hydro-specific tariff filing package for petitions before CERC. The cover title (p1) and checklist (pp2–4) identify it as the Part-II set of forms and supporting documents that a generating company must file for determination of tariff for hydro stations. It does not itself set tariff norms; it prescribes what information must be submitted and in what format, with year columns for the 2019-24 tariff period (p39).

The checklist lists Forms 1 to 19 and supporting documents such as audited balance sheets, loan agreements, approvals, PPA/BPSA, DPR, CPM/PERT charts, and justification for cost and time overruns (pp2–4). A note requires electronic copy in Word, calculations in Excel, upload on the e-filing website and submission on pen drive/flash drive (p4).

The forms then set out the data schedules. Form-1 summarises tariff (p5); Forms-1(I) and 1(II) show claimed capital cost and return on equity (pp6–10). Form-2 captures COD, station type, free power, LADF and normative parameters such as NAPAF (pp10–11). Form-3 records salient features and generation limitations (pp12–13). Forms-4 and 4A cover foreign loans and equity with exchange-rate details (pp14–16). The Form-5 series deals with admitted capital cost, cost break-ups, construction/supply/service packages, and cost or time overruns (pp17–33). Form-6 gives the financial package up to COD (p34). Forms-7 and 8 cover project-specific loans and allocation of corporate loans (pp35–38).

Forms-9A to 9F cover additional capitalisation after COD, de-capitalisation, reconciliation with books, exclusions, statements of capital cost and CWIP (pp39–47). Form-10 finances additional capitalisation (p48). Forms-11 and 12 calculate and state depreciation (pp49–50). The Form-13 series covers interest on actual and normative loans, working capital, non-tariff income and incidental expenditure during construction (pp51–56). Forms-14 and 14A provide the draw-down schedule for IDC/financing charges and actual cash expenditure (pp57–61). Month-wise design energy and peaking capability tables follow (pp62–65), then Form-16 liability flow (p66), Form-17 O&M expense (p67), Form-18 statutory charges (p68) and Form-19 summary of issues in the petition (p69). The text contains no notification number, gazette date or in-force clause.

Standard name
Tariff Regulations
Primary topics
Tariff determination, Generation tariff, Capital cost and investment

Read with this

No other documents to read with it are on Voltaic.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of CERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document