APSERC · Arunachal Pradesh State Electricity Regulatory Commission
Redressal of Grievances Regulations, 2011
Arunachal Pradesh State Electricity Regulatory Commission (Redressal of Grievances) Regulations, 2011
RegulationDated 8 Nov 2011Published in the Gazette 9 Nov 2011No. APSERC/NOTIFICATION/3/2011 dated The 8Th November, 2011
Replaced by Consumer Grievances Redressal Forum and Ombudsman Regulations, 2015
See that regulation for the date it took effect and for anything it keeps in force.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Arunachal Pradesh State Electricity Regulatory Commission issued these regulations on 8 November 2011 (Gazette 9 November 2011) to build the two-tier consumer grievance machinery contemplated by section 42 of the Electricity Act 2003: a Forum at every distribution licensee and an Electricity Ombudsman above it (p1).
Regulation 3 obliges every licensee to set up a single-member Forum, with the licensee itself appointing, paying and housing a Chairperson of specified standing and experience, and providing office, supporting staff and secretarial facilities; sittings may be held at Itanagar/Naharlagun or elsewhere in the State (p2). Regulations 4 and 5 make a prior complaint to the licensee a precondition for approaching the Forum and list what counts as a grievance — voltage fluctuation, erratic supply, defective billing and meters, defective street lights, missed routine complaints, connection delay and other faults the licensee is duty-bound to rectify (p2).
Regulation 6 gives the Forum power to call for information, hear parties and consult experts, caps the time for disposal, and routes a licensee's failure to comply to the Commission. Regulation 7 adds accessibility, record-keeping and annual publicity duties, including printing Forum details in consumers' bills (p2–3). Regulation 8 has the Commission appoint or designate a single Ombudsman with comparable qualifications and fixed age/term limits, a set monthly remuneration, a minimum weekly presence in office and Commission-borne establishment costs (p3). Regulation 9 lets consumers escalate after the Forum window lapses, gives the Ombudsman the same evidence-gathering powers, a suo motu jurisdiction over grievances of general concern, and reporting of non-compliance to the Commission (p3–4). Regulation 10 prefers mediation and conciliation, an unnumbered clause beside it requires half-yearly reports from both Forum and Ombudsman, and regulation 11 gives the Commission a power to remove difficulties (p4).
Read with this
Amendments and corrections
Voltaic last read APSERC's website for final documents on 30 Sep 2026 and for drafts on 23 Nov 2026 (2 pages). A document APSERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.