Skip to content

JSERC · Jharkhand State Electricity Regulatory Commission

Group Net Metering and Virtual Net Metering Regulations, 2024

Jharkhand State Electricity Regulatory Commission (Group Net Metering and Virtual Net Metering) Regulations, 2024

RegulationDated 9 May 2024Published in the Gazette 9 May 2024100 dated 9 th May, 2024

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on jserc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

JSERC issued these Regulations (Notification no. 100) to create two parallel frameworks — Group Net Metering and Virtual Net Metering — for electricity consumers in Jharkhand who generate solar energy from a self-owned or third-party-owned project (p1–2). They extend to the whole State and take effect on gazette publication, 9 May 2024 (p2).

Regulation 4 opens both frameworks to all eligible consumers, excludes those with pending arrears with the distribution licensee, and requires the licensee to study the impact of renewable systems on its network — voltage and frequency imbalance, harmonics, technical losses — and report to the Commission within six months (p3). Regulations 5–7 set the consumer journey: application in the licensee's format with a non-refundable fee, technical feasibility analysis within seven working days, first-come-first-serve approval, a connection agreement within 30 days, installation within six months, and deemed cancellation or termination on default (p3–4).

Regulation 8 deals with metering, cross-referring the 2015 Rooftop Solar Regulations for the generation meter and placing net-meter cost on the consumer (p4). Regulations 9 and 10 are the operative core: energy accounting and settlement rules for each framework — adjustment at the host connection first, then against other connections on a consumer-declared priority list and share ratio, time-of-day block matching, carry-forward of surplus as energy credits within a financial-year settlement period, and payment for unadjusted credit at the end of the period at the rate in the licensee's latest tariff order (p4–6).

Regulations 11–19 cross-refer theft/tampering, REC eligibility and metering matters to the 2015 Regulations, give the licensee inspection rights, route billing disputes to the 2020 consumer grievance framework, exempt these systems from wheeling, banking and cross-subsidy charges per the 2022 Solar Policy, allow the generation to count for RPO, and give the Commission powers to remove difficulties, amend and interpret (p7–8).

Standard name
Net Metering and Rooftop Solar
Primary topics
Net metering, Metering, Open access charges

Read with this

No other documents to read with it are on Voltaic.

Voltaic last read JSERC's website for final documents on 24 Nov 2026 (5 pages) and for drafts on 21 Nov 2026. A document JSERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of JSERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on jserc.org ↗

Report an issue with this document