Skip to content

APSERC · Arunachal Pradesh State Electricity Regulatory Commission

Multi Year Tariff Regulations, 2024

Arunachal Pradesh State Electricity Regulatory Commission (Multi Year Tariff) Regulations, 2024

RegulationDated 19 Nov 2024Published in the Gazette 10 Dec 2024No. APSERC/Notification/49/2024 dated The 19th November, 2024

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on apserc.nic.in ↗

Summary

Summary written by software, from pages 1 to 17 of 60. Check the regulator's original before you rely on it.

APSERC's Multi Year Tariff Regulations, 2024 were issued by notification dated 19 November 2024 and published in the Arunachal Pradesh Gazette on 10 December 2024 (p1). They replace the 2018 MYT Regulations with all amendments (p1) and set a five-year control period from 1 April 2025 to 31 March 2030 (p1, p4).

Chapter 1 (p1–10) fixes the title, extent and applicability, then defines roughly 108 terms. It covers existing and future generating companies supplying under Section 62 (captive generation and renewable sources excluded, hydro above 25 MW included), intra-state transmission licensees, distribution licensees in their wires and retail supply businesses, and SLDC. Where tariff comes from competitive bidding, the Commission adopts it under Section 63; where it is cost-based, these regulations govern (p2). Projects already under commercial operation, and all matters up to 31 March 2025, remain under the 2018 regulations (p1).

Chapter 2 (p10–16) builds the MYT framework: a multi-year Business Plan, whole-control-period ARR forecast and first-year tariff, annual performance review, truing up, revised ARR for the ensuing year, controllable/uncontrollable categorisation, and a sharing mechanism for gains and losses. It also lists what each Business Plan must contain for generation, transmission, distribution and SLDC (p12–14), allows the Commission to stipulate performance trajectories, and preserves suo motu tariff determination (p14, p16). Chapter 3, beginning at p17, turns to the filing procedure, forms, fees, affidavit requirement and the Commission's clarification and registration timeline.

Standard name
Multi Year Tariff Regulations
Primary topics
Multi Year Tariff (MYT), Tariff determination, ARR and true-up

Read with this

Earlier drafts

8 more documents belong here and are not on Voltaic: 4 drafts or notices on a draft not held as English text and 4 procedures or orders made under it not held as English text.

Voltaic last read APSERC's website for final documents on 30 Sep 2026 and for drafts on 23 Nov 2026 (2 pages). A document APSERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of APSERC's website on 30 Sep 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on apserc.nic.in ↗

Report an issue with this document