Summary written by software. Check the regulator's original before you rely on it.
This is MSERC's principal licensing instrument for intra-state transmission in Meghalaya: notification No. MSERC/TRANS-LIC/05/2011/05 dated 29 August 2011, made under s.181(1) of the Electricity Act 2003 and extending to the whole state (p1). Chapter 1 (pp1–3) fixes the title, extent and commencement and supplies the working vocabulary — applicant, area of activity, licensed business, other business, deemed licensee, transmission licence — together with interpretation rules.
Chapter 2 (pp3–14) is the operative core. It prescribes how an application for a transmission licence is made, filed in six sets and copied to the State Transmission Utility; how it is advertised and opened to public comment; the eligibility tests on technical and financial capability; and the STU's advisory recommendation, which is expressly not binding (pp3–6). It then covers the Commission's notice of intention to grant, the 25-year licence term, licence fee and interest on default, and the licensee's continuing obligations — compliance with law, grid codes, standards and despatch directions, prohibitions on cross-ownership, merger, assignment and non-transmission use of system assets, approval for asset transfers, business-plan and investment submissions, information and incident reporting, investigation under s.128, amendment and revocation of licences (pp6–14).
An accounts-and-audit chapter (reg 25, pp14–15) requires statutory-form accounts, separation of licensed from other business, an auditor's report and annual filing, followed by a short Miscellaneous chapter giving the Commission power to remove difficulties, amend the regulations and depart from them for recorded reasons (p15). Appendix I is the application form (pp16–18). Appendix II (pp19–34) is the draft licence itself: grant terms, General Conditions, Technical Conditions, Use of System and connection conditions, Expected Revenue Calculation and Tariffs, and miscellaneous matters, with the general conditions extended to deemed licensees.
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read MSERC's website for final documents on 26 Nov 2026 and for drafts on 21 Nov 2026. A document MSERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of MSERC's website on 26 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.