Skip to content

MPERC · Madhya Pradesh Electricity Regulatory Commission

Renewable Energy Tariff Regulations, 2024 (Revision-I)

Madhya Pradesh Electricity Regulatory Commission (Terms and Conditions for Tariff determination of energy from Renewable Energy Sources) (Revision- I) Regulations, 2024

RegulationDated 25 Jul 2024No. 1790/MPERC/2024 dated 25th July 2024

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on mperc.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is MPERC's principal tariff regulation for renewable energy in Madhya Pradesh, made under s.181(2)(zd) read with s.61 of the Electricity Act, 2003 (p35). It replaces the 2017 RE tariff regulations and sets the framework for both generic and project-specific tariffs for a control period running to 31 March 2027 (p35, p41, p59).

Regulations 1–4 (p35–40) give the short title, definitions, scope and eligibility. The Regulation applies where the Commission determines RE tariffs under s.62 read with s.86, subject to eligibility: wind below 10 MW, solar PV/thermal below 5 MW, small hydro up to 25 MW, biomass, bagasse cogeneration, biogas, MSW, biomass gasifier, wind-solar hybrid below 10 MW, and RE with storage. At or above the competitive-bidding thresholds (wind ≥10 MW, solar ≥5 MW, hybrid ≥10 MW), tariffs are to be adopted under s.63 (p39–40).

Chapter 1 (p41–44) covers general principles: control period, technologies eligible for generic tariff (small hydro, biomass Rankine, bagasse cogeneration, biogas, MSW) versus project-specific tariff (solar PV, solar thermal, wind, biomass gasifier, hybrid, RE with storage), petition procedure, tariff structure and design, over-generation treatment, and despatch/scheduling principles.

Chapter 2 (p44–48) lays down financial principles: capital cost, debt-equity ratio, loan tenure and interest, depreciation, return on equity, interest on working capital, O&M expenses, rebate, late payment surcharge, CDM benefit sharing, subsidy/incentive treatment, and pass-through of cess/duties/water charges.

Chapters 3–13 (p48–59) set technology-specific parameters — capital cost, CUF/PLF, auxiliary consumption, SHR, GCV, fuel mix/cost, O&M, and tariff design — for small hydro, biomass Rankine, bagasse cogeneration, biogas, MSW, solar PV, solar thermal, wind, biomass gasifier, wind-solar hybrid, and RE with storage. Chapter 14 (p59) deals with deviation from norms and powers to amend, relax, remove difficulty, plus repeal and saving. Forms 1.1–2.2 (p60–66) provide petition templates and levelised tariff computation formats.

Standard name
Renewable Energy Tariff Regulations
Primary topics
Renewable energy tariff, Tariff determination, Capital cost and investment

Read with this

No other documents to read with it are on Voltaic.

Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of MPERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on mperc.in ↗

Report an issue with this document