GERC · Gujarat Electricity Regulatory Commission
Levy and Collection of Fees and Charges by SLDC Regulations, 2005 — First Amendment, 2015 — Draft
Gujarat Electricity Regulatory Commission (Levy and Collection of Fees and Charges by SLDC) (First Amendment) Regulations, 2015
Draft amendmentDated 18 Dec 2015
Draft
A proposal, not law. Voltaic holds no final regulation made from this draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a short two-part instrument from the Gujarat Electricity Regulatory Commission. Page 1 carries the text of the First Amendment to the GERC (Levy and Collection of Fees and Charges by SLDC) Regulations, 2005 (No. 5 of 2005), the principal Regulations. Page 2 carries the Commission's Explanatory Note giving its reasons.
Clause 1 (p1) supplies the short title, extends the amendment to the whole of Gujarat, and provides that it comes into force on the date of publication in the Gazette. Clause 2 (p1) is the operative change: it substitutes Section 4(xviii) of the principal instrument so that scheduling and system operation charges recovered by the SLDC from users of the grid are considered at the time of tariff determination and truing up for each financial year.
The Explanatory Note (p2) explains why: the SLDC recovers these charges under the GERC (Terms and Conditions of Intra-State Open Access) Regulations, 2011, but under the existing clause that revenue was not being considered in truing up, even though the SLDC's functions are carried out using resources whose expenses are allowed through the ARR. The Commission decided to treat the revenue as income in truing up.
The document therefore matters to anyone tracking SLDC charges and the revenue side of SLDC ARR and truing-up proceedings. It creates no new levy; its whole effect is a single substituted sub-clause (p1–2).
Read with this
Voltaic holds no final regulation made from this draft.
No other documents to read with it are on Voltaic.