KERC · Karnataka Electricity Regulatory Commission
Electricity Supply Code, 2004
Karnataka Electricity Regulatory Commission (Electricity Supply) Code, 2004
CodeDated 12 Nov 2004Published in the Gazette 2 Dec 2004Notification No.B/13/04 dated 12.11.2004
Summary
Summary written by software. Check the regulator's original before you rely on it.
The KERC (Electricity Supply) Code, 2004, notified by Notification No.B/13/04 dated 12.11.2004 and published in the Karnataka Gazette on 02.12.2004 (p1), is the Commission's standard Supply Code under Section 50 of the Electricity Act, 2003. It binds licensees and consumers in Karnataka and is intended to supersede the 2001 billing code and parts of the 2000-01 Supply and Distribution Code (p12). The Code commences only from a date to be notified by the Commission (p1), so the operative start date is not in the document.
The Code is organised into twelve clauses. Clause 1 sets short title, conditional commencement and extent (p1). Clause 2 defines 20 terms used throughout, including Act, Additional Surcharge, Agreement, Bill Date, Due date, Licensee, Ombudsman, Surcharge, Tariff and Wheeling Charges (p1–3).
Clause 3 specifies how licensees may recover charges — tariff, taxes, wheeling and cross-subsidy surcharges, open-access charges and penal charges — and requires the schedule of service-line and consumer-category charges to be Commission-approved and embedded in the Model Conditions of Supply (p3). Clause 4 is the billing core: bill contents, means of delivery, meter-reading based billing, estimated bills when meters cannot be read, first bills, time limits for bill issue, arrears recovery limits, overcharge refunds, special meter reading on vacation, modes of payment, instalment options, payment adjustment priority, the bill-dispute review procedure, and interest for late payment (p3–8).
Clause 5 covers protection of metering equipment, tampering and damage, seals and testing, and cost allocation for damaged metering (p8–9). Clause 6 governs licensee entry into consumer premises, identity verification, purposes of entry, magistrate-ordered entry and consequences of refusal (p9–10). Clause 7 lists the only grounds on which supply may be disconnected and protects consumers who deposit disputed amounts (p10–11). Clause 8 specifies reconnection obligations and timeframes by reference to the KERC Standards of Performance Regulations 2004 (p11). Clause 9 prescribes the content, language, manner of service and payment-notice elements for disconnection notices (p11–12).
Clauses 10 to 12 provide for expert-panel review of the Code, the Commission's power to issue directions to remove difficulties, and repeal of the KERC (Code of Practice on Payment of Bills) 2001 and Sections 26 and 29 of the KERC (Electricity Supply and Distribution) Code 2000-01 (p12). For an analyst, the document is the baseline procedural rulebook for Karnataka distribution billing, disconnection and reconnection, and it links directly to the separate Consumer Grievance Redressal Forum and Ombudsman Regulations 2004 and the Standards of Performance Regulations 2004.
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of KERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.