KSERC · Kerala State Electricity Regulatory Commission
Power Procurement from Renewable Sources by Distribution Licensee Regulations, 2013 — Annexures
Annexures of KSERC (Power Procurement from Renewable Sources by Distribution Licensee) Regulations, 2013
RegulationDate not stated
Replaced by Renewable Energy and Net Metering Regulations, 2020
See that regulation for the date it took effect and for anything it keeps in force.
Summary
Summary written by software. Check the regulator's original before you rely on it.
These are the annexure sheets of the KSERC (Power Procurement from Renewable Sources by Distribution Licensee) Regulations, 2013 — the assumption tables behind the Commission's generic renewable tariffs, not operative regulatory text.
Page 1 is the small-hydro sheet for projects of 5 MW to 25 MW. Page 2 carries the heading "ANNEXURE B (SMALL HYDRO : LESS THAN 5 MW)" and repeats the same template for projects below 5 MW — the only annexure letter printed in the text, implying page 1 is Annexure A. Page 3 is the wind energy sheet. All three follow one six-row structure: power generation capacity (installed capacity, CUF, auxiliary consumption, deration factor, useful life); project cost (capital cost per MW); sources of fund (tariff period, debt:equity split, debt and equity amounts, loan amount, moratorium and repayment periods, interest rate, normative post-tax ROE split between the first ten years and the eleventh year onwards, weighted average ROE, discount rate); financial assumptions (income tax, MAT rate for the first ten years, 80-IA benefit flag, depreciation rates for the first twelve years and from the thirteenth year); working capital (O&M charges, maintenance spares, receivables, interest on working capital); and operation and maintenance (base-year plant O&M, total O&M expenses, escalation).
The tables in the extract are largely blank apart from a capital-cost-per-MW cell on each sheet, so the annexures show an analyst which inputs the Commission fixes but not their values. Nothing here sets tariff rates, eligibility or procedure.
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read KSERC's website for final documents on 24 Nov 2026. A document KSERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.