MERC · Maharashtra Electricity Regulatory Commission
Specific Conditions of Distribution Licence for JNPT SEZ Regulations, 2018 — Statement of Reasons
Maharashtra Electricity Regulatory Commission (Specific Conditions of Distribution Licence applicable to Jawaharlal Nehru Port Trust for SEZ at Jawaharlal Nehru Port, Taluka Uran, District Raigad) Regulations, 2018
Statement of reasonsDated 13 Nov 2018
The commission's reasons for the JNPT SEZ Specific Conditions of Distribution Licence Regulations, 2018.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is MERC's two-page Statement of Reasons (p1–2) recording why it finalised, without change, the draft Regulations setting out the specific distribution licence conditions for Jawaharlal Nehru Port Trust as developer of the JNPT SEZ at Taluka Uran, District Raigad.
The document first sets out the background: JNPT was notified as SEZ developer by Gazette Notification S.O. 2047 (E) dated 11 August 2014 (p1), and following the 3 March 2010 amendment to the Electricity Act, 2003, an SEZ developer is the deemed distribution licensee for the notified area (p1). It records the Commission's Order of 14 June 2018 in Case No. 47 of 2018 taking JNPT's deemed licensee status on record and deferring the licence conditions to a separate exercise (p1).
It then describes the consultation: draft Regulations covering term of licence, area of licence and other conditions; a public notice in four newspapers on 28 September 2018; comments due 28 October 2018 (p1). One suggestion came in, from JNPT itself (letter dated 31 October 2018), proposing that the 25-year licence term run from the date of publication of the Regulations in the Official Gazette rather than from the SEZ notification date of 11 August 2014 (p2).
The Commission reproduces the draft clause 5 and JNPT's proposed replacement, quotes the proviso to Section 14(b), and rejects the change: as the deemed licence runs from the SEZ notification date, the draft term is in line with the Act, so no substantive change was needed and the Regulations were finalised as drafted (p2). The SoR is signed by two Members and the Chairperson.
Read with this
The regulation
7 more documents belong here and are not on Voltaic: 7 drafts or notices on a draft not held as English text.
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.