Fixation of Trading Margin Regulations, 2005 — Review — Statement of Reasons
Review of the Central Electricity Regulatory Commission (Fixation of Trading Margin), Regulations, 2005.
Statement of reasonsDated 11 Jan 2010No. L-7/25(5)/2003-CERC
The commission's reasons for a regulation Voltaic does not hold.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the CERC's Statement of Reasons for revising the trading margin charged by inter-State electricity traders (p1). The Commission records that it is empowered under s.79(i)(j) of the Electricity Act 2003, that it first fixed a trading margin in January 2006, and that it engaged KPMG to study the issue after changes in the sector — new trading licence regulations and the emergence of power exchanges (p1).
A draft was issued for comment by public notice on 12.10.2009 and an oral hearing was held on 2.12.2009 (p2). The document sets out the objections raised — leave margins to market forces, fix them in absolute rather than percentage terms, charge on contracted capacity, penalise defaulting buyers instead of raising margins — and answers each in turn (p2–5).
Its decisions: no margin cap for long-term power purchase agreements of over a year, left to market forces (p3); an absolute cap for short-term buy / short-term sell contracts, set at 7 paise/kWh above a sale price of Rs 3/kWh and 4 paise/kWh at or below it, replacing the draft's percentage band (p3–4); margins computed on scheduled quantity rather than contracted or delivered quantity (p5); and a ceiling on the total margin across a chain of trader-to-trader transactions so margins do not cascade (p5). Swapping and banking are held to fall outside trading altogether, as no re-sale is involved (p4).
The regulations take effect 30 days after Gazette notification, and the Commission directs the draft regulations to be published in the Gazette with these changes (p2, p5). The Annexure lists the stakeholders who commented (p6).
Read with this
Voltaic does not hold the regulation itself.
No other documents to read with it are on Voltaic.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.