OERC · Odisha Electricity Regulatory Commission
Odisha Deviation Settlement Mechanism and Related Matters Regulations, 2025 — Draft
Odisha Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters) Regulations, 2025
Draft regulationDated 29 Jul 2025OERC/RA/DSM REG.- 31/2020/963 dated 29.07.2025
Draft
A proposal that has since been finalised as the Deviation Settlement Mechanism and Related Matters Regulations, 2025.
Summary
Summary written by software. Check the regulator's original before you rely on it.
Page 1 is the Commission's public notice pre-publishing the draft under s.181(3) of the Electricity Act 2003 and inviting comments by 30.08.2025; it says the final regulations may be modified and published in the official Gazette. The draft itself runs pp2–13 and is not yet a commenced regulation: its notification date is blank, and clause 1(2) leaves commencement to a separate notification. Clause 1(3) would repeal the OERC Intra-State ABT Regulation, 2007 from commencement.
The draft applies to sellers and buyers using intra-state transmission or distribution through open access. Sellers with installed capacity of 100 kW and above scheduling through SLDC are covered; buyers include distribution licensees, deemed distribution licensees and intra-state transmission consumers scheduled through SLDC. Consumers on the transmission or distribution network are routed to the Open Access Regulations 2020 and Green Energy Open Access Regulations 2023 (p2–3).
Regulations 4–7 define the key terms and require State Entities to adhere to schedules, give SLDC binding despatch instructions, enter connection agreements and install interval meters; they also set formulas for seller and buyer deviation (pp2–6). Regulation 8 sets the Normal Rate as the highest of IDAM ACP, RTM ACP and a composite of both plus ancillary service charge (p7).
Regulation 9 is the operative charging code: frequency-linked charges for general sellers; frequency-independent charges for run-of-river, MSW and wind/solar/hybrid sellers; volume limits; standalone storage and storage-plus-RE treatment; buyer charges with volume limits; infirm power; start-up/auxiliary drawal; forced outage; and HP-DAM (pp7–11). Regulations 10–12 establish the State Deviation Pool Account, the accounting procedure and mock exercise, payment timelines, late payment surcharge and letter of credit (pp11–12). Regulations 13–19 cover SLDC roles, a dispute committee and the Commission's powers to relax, amend, remove difficulties and interpret (pp12–13).
Read with this
The regulation
- Dated 18 Dec 2025Deviation Settlement Mechanism and Related Matters Regulations, 2025
Voltaic last read OERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (9 pages) and for drafts on 21 Nov 2026. A document OERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.