BERC · Bihar Electricity Regulatory Commission
Standards of Performance of Distribution Licensee Regulations, 2006 — 1st Amendment, 2012
Bihar Electricity Regulatory Commission (Standards of Performance of Distribution Licensee) (1st Amendment) Regulations, 2012
AmendmentDated 12 Dec 2012BERC-Regl.-9/06(Part-II)–08–1226 dated The12th December, 2012
Amends a regulation Voltaic does not hold.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the first amendment to the Bihar Electricity Regulatory Commission (Standards of Performance of Distribution Licensee) Regulations, 2006, issued by the Commission on 12 December 2012 under s.181(1) and s.181(2)(za) read with ss.57, 58 and 59 of the Electricity Act 2003 (p9). It extends to the whole of Bihar and applies to all distribution licensees in their licensed areas, coming into force on publication in the Bihar Gazette (p9).
The operative text runs pp9–13. Clause 2 substitutes the whole Schedule referred to in Regulations 26 and 27(1) of Chapter 7 (p9). That Schedule is the guaranteed-standards table: for each service area it states the time schedule for completing the work — normal fuse-off, overhead and underground cable breakdowns, distribution transformer failure, scheduled outage and restoration of supply, voltage fluctuation/network expansion/substation erection, meter complaints, reconnection, new connections, load enhancement and temporary connections at the various network-extension levels, title transfer, shifting of meters/lines/transformers and billing complaints — and the compensation payable per day of default, differentiating cities and towns from rural areas and single-consumer from multi-consumer events (p9–13).
Clause 3 substitutes Regulation 27(2), laying down the claim procedure: a written claim by registered post or hand delivery to the Divisional Engineer/Electrical Executive Engineer, a decision within thirty days, possible recovery of compensation from the salary of defaulting staff, a free claim format at every billing office, and payment per Regulation 29 (p13).
Clause 4 substitutes Appendix-C and Appendices D(1/2) and D(2/2) under Regulation 30(1) — the licensee's quarterly/annual reporting formats on overall performance and on consumer complaints and compensation (p13–18).
Read with this
Voltaic does not hold the regulation itself.
Amendments and corrections
Voltaic last read BERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document BERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.