TNERC · Tamil Nadu Electricity Regulatory Commission
Licensing Regulations 2005
RegulationDated 24 Jun 2005Published in the Gazette 13 Apr 2011
Summary
Summary written by software. Check the regulator's original before you rely on it.
Pages 4 and 5 are a contents/regulation index, listing numbered regulations grouped by chapter (e.g. chapter labels corresponding to Regulations 1–4, 5, 6, 7, and groups running through the high 20s and into the 30s), but the regulation titles themselves are unrecoverable from the table cells (pp4–5). Page 15 appears to hold a classification table keyed to voltage levels with entries running to 220 kV and 110 kV (p15).
From roughly page 33 onward the document is dominated by standard-form application formats and their appended instructions, undertakings and checklists — e.g. forms for generating-company and distribution/transmission licence applicants, with sections on particulars of the applicant, company/firm details, names of directors, and notes on definitions and procedures (pp34, 42–44, 47–50, 57–68, 73–79). Several pages are tables of contents for those forms.
The reader should treat this capture as an index to a source document only.
Read with this
Procedures and orders made under it
- Dated 15 Oct 2012Trading Margin Order under Licensing Regulations, 2005 — 2012
One more document belongs here and is not on Voltaic: a copy in another language.
Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of TNERC's website on 29 Sep 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.