APSERC · Arunachal Pradesh State Electricity Regulatory Commission
Multi Year Tariff Regulations, 2018 for Generation, Transmission, SLDC, Wheeling and Retail Supply — Draft
Arunachal Pradesh State Electricity Regulatory Commission (Multi Year Tariff) Regulations, 2018 for Generation, Transmission, SLDC, Wheeling and Retail Supply
Draft regulationDated 1 Jun 2018
Draft
A proposal, not law. Voltaic holds no final regulation made from this draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Arunachal Pradesh State Electricity Regulatory Commission (APSERC) issued this draft notification on 1 June 2018 (p1) to publish, for objections and suggestions, a full replacement for its Multi-Year Tariff framework. The draft regulations would be called the APSERC (Multi Year Tariff) Regulations, 2018 for Generation, Transmission, SLDC, Wheeling and Retail Supply (p6). They are made under the Electricity Act 2003 and would supersede the APSERC (Multi-Year Tariff) Regulations, 2013 (p1, p6). They are to come into force on publication in the Arunachal Pradesh Official Gazette and apply for tariff determination from 1 April 2018 (p6), with a control period of three years from 1 April 2018 to 31 March 2021 and successive three-year blocks (p11). The notification invites comments within 30 days of posting on the Commission's website, but the deadline date is left blank (p1). The draft does not apply to renewable energy generation projects, which remain under the separate 2012 RE tariff regulations (p6).
Chapter 1 (p6–19) sets the short title, commencement, scope and extensive definitions. Chapter 2 (p20–31) establishes the MYT framework: business plans, MYT applications, mid-term review, annual performance review and truing up, categorisation of controllable and uncontrollable factors, sharing of gains and losses, and the Commission's suo motu powers. Chapter 3 (p32–38) lays out the tariff-determination procedure—filing, publication, hearing, tariff orders, review and amendment—and rules for generation, transmission, distribution and SLDC tariff applications. Chapter 4 (p39–51) contains financial principles: prudence, debt-equity, capital cost and additional capitalisation, consumer contributions/grants, return on equity, interest, depreciation, O&M expenses, working capital, deviation settlement/UI charges, tax, rebate, late payment, foreign-exchange variation and regulatory asset. Chapter 5 (p52–53) deals with tariff income, other revenue, surcharge, income from other business and sharing of CDM credits.
Chapters 6–10 (p54–85) contain the sector-specific tariff regimes. Chapter 6 (p54–64) covers generation tariff, and by its terms applies to hydro generating stations above 25 MW selling to a distribution licensee; it specifies capacity and energy charges, capital cost, renovation and modernisation, hydro operating norms, declared-capacity demonstration, non-tariff income, incentives, rebates and billing. Chapter 7 (p65–71) covers intra-state transmission: annual transmission charges, capital investment plan, R&M, operating norms and availability, sharing of transmission charges, open access, transmission losses, payment modalities and scheduling. Chapter 8 (p72–74) covers SLDC fees and charges—capital plan, recoverable expenses, determination, billing and grid-connection applications. Chapter 9 (p75–79) covers distribution wheeling: account separation, ARR components, an allocation matrix where separate accounts are unavailable, wheeling charges, bad debts and wheeling losses. Chapter 10 (p80–85) covers retail supply: ARR components, power purchase cost, transmission and UI charges, capital plan, sales forecast, non-tariff income, cross-subsidy surcharge, AT&C loss reduction obligations and tariff determination.
Chapter 11 (p86–87) is miscellaneous—hearings, directions, interpretation, ceiling norms, powers to amend, relax and remove difficulties, and a three-year review. The annexures (p88–99) provide a depreciation schedule, the procedure for calculating transmission availability, formats for MYT/true-up petitions across generation, transmission, SLDC, distribution and retail supply, a hydro-station certification format, and a business-plan format.
Read with this
Voltaic holds no final regulation made from this draft.
Proposed changes (drafts with no final yet)
- Dated 11 Jul 2018Notice extending the date for comments: Draft Multi Year Tariff Regulations, 2018 — Comment Deadline Extension Notice
Voltaic last read APSERC's website for final documents on 30 Sep 2026 and for drafts on 23 Nov 2026 (2 pages). A document APSERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.