Skip to content

TNERC · Tamil Nadu Electricity Regulatory Commission

Stakeholders comments on Net Metering, LT Connectivity and Renewable Energy Certificate — Draft

Stakeholders comments on Netmetering, LT Connectivity and Renewable Energy Certificate are invited

Comments received on a draftDated 24 Jul 2013

Draft

Voltaic holds no final regulation made from this draft.

Comments received on a draft that is not on Voltaic.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a Tamil Nadu Electricity Regulatory Commission consultation paper: a one-page foreword (p1) circulating, for stakeholder comment, a detailed procedure that TANGEDCO submitted at the Commission's direction. The direction came in the Commission's order of 7 March 2013 on 'Issues related to Tamil Nadu Solar Energy Policy 2012', which asked TANGEDCO to work out net metering, LT connectivity and renewable energy certificate procedures for the Commission's approval; comments were invited up to 15 August 2013 (p1).

The annexed procedure (pp2–6) is the substance. Section 1 specifies metering for LT rooftop solar — two meters (a generation meter after the inverter and a bi-directional import/export meter), where each sits, who bears the cost, joint reading in the presence of the solar generator, a meter card carrying the generator's bank details, and periodic transmission of generation data to TEDA so that the generation-based incentive can be credited (pp2–3).

Sections 2 and 3 specify what happens to the energy. No tariff for excess generation or export exists at present, so commercial consumers get power credits only while domestic consumers get both the incentive and power credits; import and export are netted each billing period, surplus credit carries into the next cycle and can be carried to the end of the financial year, when any remainder is paid for at a discount to the Commission's solar tariff on the wind-mill analogy (pp3–4).

Section 4 sets the connection, safety and protection regime: operation and maintenance responsibility and liability resting with the consumer, anti-islanding protection and rated protective devices, lockable isolating switches for TANGEDCO staff, TANGEDCO's right to disconnect, power-quality obligations and deferral of harmonic limits to the Central Electricity Authority; it also lists seven permitted grid-interactive configurations with and without battery and DG (pp4–6). Sections 5–7 refer meter, harmonic and inverter standards to Annexures A, B and C. Annexure A (pp7–10) is a functional specification for single- and three-phase bi-directional meters covering accuracy, display, memory, communication, sealing, warranty, tamper detection and influence quantities, plus a display sequence. Annexure B (p11) adopts IEEE 519 harmonic limits. Annexure C (pp11–12) adopts IEC/IS standards for inverter efficiency and environmental testing and requires the inverter to supervise the grid and disconnect on failure or voltage excursion. Two diagrams (pp12–13) show rooftop solar with and without battery.

Standard name
Net Metering and Rooftop Solar
Primary topics
Net metering, Metering, Electrical safety

Read with this

Voltaic holds no final regulation made from this draft.

No other documents to read with it are on Voltaic.

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document