UPERC · Uttar Pradesh Electricity Regulatory Commission
Power System Development Fund Regulations, 2023
Uttar Pradesh Electricity Regulatory Commission (Power System Development Fund) Regulations, 2023
RegulationDated 20 Jun 2023UPERC/Secy./Regulation/001 dated June 20, 2023
Summary
Summary written by software. Check the regulator's original before you rely on it.
The UPERC (Power System Development Fund) Regulations, 2023 create and govern a state fund for grid infrastructure in Uttar Pradesh. Notified at Lucknow on 20 June 2023 under s.181(1) and s.181(2)(zp) of the Electricity Act, 2003, they take effect from the date of publication in the Official Gazette — a date the text does not print (p6).
Regulation 3 constitutes the PSDF, to be maintained and operated by UPSLDC, and sets out what flows into it: balances remaining in the State Deviation Pool Account after settlement of Deviation Settlement Charges, Reactive Energy Charges left in the State Reactive Energy Charges Account, and any other charges the Commission notifies. Transfers are made quarterly, with collecting agencies retaining enough to pay intra-state entities and NRPC, and amounts accumulated before these regulations are also to be moved into the fund (p7–8).
Regulation 4 governs use of the money: transmission works to relieve intra-state congestion, reactive compensation to improve voltage profile, protection schemes and corrections identified in protection audits, and other measures including capacity building, grid management, ancillary services, technical studies and pilot projects on emerging technologies. Funding is by grant, capped per project, and deducted from project capital cost so it is not claimed in tariff; projects covered by other government schemes, and private-sector projects, are excluded (p8).
Regulations 5–7 cover delivery. UPSLDC is the Nodal Agency, with record-keeping, monitoring, procedure-framing, annual-report and website-disclosure duties. A Monitoring Committee chaired by the UPSLDC Managing Director appraises, prioritises and sanctions proposals. Project entities apply through their boards; the Commission clears the project against the scope of these regulations before funds are sanctioned and released in phases against actual progress (p8–10). Regulations 8–11 place execution and O&M on the project entity, require separate accounts, monthly progress monitoring, quarterly status reporting and an annual PSDF report with audited accounts; Regulations 12–14 are difficulty-removal, relaxation and inherent-powers clauses (p10–11).
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read UPERC's website for final documents on 24 Nov 2026 (2 pages). A document UPERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of UPERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.