Summary written by software. Check the regulator's original before you rely on it.
This is a short principal regulation of the Rajasthan Electricity Regulatory Commission, issued at Jaipur on 4 February 2002, which creates the Commission's appellate route against orders of the Electrical Inspector (p1). It is made under the Rajasthan Power Sector Reforms Act, 1999 (s.57 read with s.38), not the later Electricity Act, and it comes into force from gazette publication — though the gazette date is not printed (p1).
Chapter 1 is general. It gives the short title, commencement and scope, applying the regulations to orders the Electrical Inspector passes under sections 36 and 55 of the Indian Electricity Act 1910, while expressly excluding decisions of a purely administrative nature (p1). Definitions are not enumerated: words and expressions carry the meaning they have in the 1999 Act and the rules and regulations made under it (p1). A separate clause requires the Inspector to pass orders in discharge of those same two functions (p1).
The operative machinery sits on page 2. Any interested consumer or non-consumer aggrieved by an Inspector's order may appeal to the Commission by petition filed in conformity with the RERC (Conduct of Business) Regulations, 2000, attaching a certified copy of the order and a list of parties, and setting out numbered grounds of objection and the relief sought. An appeal does not stay the Inspector's order unless the Commission orders otherwise. The appeal must carry proof of payment of a prescribed fee to the Commission and must be filed within a stated limitation period running from the date of the order. The Commission may summon the record of the proceedings; a bench of one or more members, as the Chairman directs, hears the appeal; and the Commission may confirm, vary or reverse the order appealed against (p2).
The clause numbering is irregular — fees and limitation repeat numbers 3 and 4, and the sequence then jumps to 7.
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read RERC's website for final documents on 24 Nov 2026. A document RERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of RERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.