RPO and REC Framework Implementation Regulations, 2017 — Draft
Delhi Electricity Regulatory Commission (Renewable Purchase Obligation and Renewable Energy Certificate Framework Implementation) Regulations, 2017
Draft regulationDated 15 Aug 2017
Draft
A proposal, not law. Voltaic holds no final regulation made from this draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Delhi Electricity Regulatory Commission has published, in draft form for previous publication, the DERC (Renewable Purchase Obligation and Renewable Energy Certificate Framework Implementation) Regulations, 2017. The instrument creates the local machinery for imposing and enforcing renewable purchase obligation (RPO) in the National Capital Territory of Delhi and for giving effect to the Central Commission's Renewable Energy Certificate (REC) framework. It is made under s.181 read with ss.66 and 86(1)(e) of the Electricity Act, 2003, extends to the whole of NCT of Delhi, and is to come into force on publication in the Delhi Gazette; the notification number and date are left blank in the draft (p1–2).
Part 1 (p2–4) is preliminary: the short title, commencement, extent and applicability clause, binding the distribution licensee, captive users and open access consumers; the definitions, which tie the regulation to the CERC REC Regulations, 2010 and to the DERC Open Access Regulations; and an interpretation clause subordinating the regulations to the Act and rules.
Part 2 (p5–8) is the operative core. Regulation 4 states how RPO targets are set and how compliance is measured and met — by own generation, renewable purchase, RECs or a combination — and which purchases and arrangements count towards it, together with quarterly reporting and a post-year window for buying RECs against shortfall. Regulation 5 sets out the State Nodal Agency's accreditation, data-collection, publication, reporting and advisory functions, and how its remuneration is fixed and recovered. Regulation 6 places annual reporting duties on captive users and open access consumers and makes shortfall penalty-liable. Regulations 7 to 9 cover the choice between tariff pricing and the REC mechanism, priority open access with grid-connectivity standards, and the consequences of default, including non-pass-through of penalty and disconnection of the defaulting entity's connectivity.
Part 3 (p9–10) is miscellaneous: power to relax, power to amend, power to remove difficulties, and a repeal-and-savings clause preserving past actions and the Commission's residual powers.
Read with this
Voltaic holds no final regulation made from this draft.
Proposed changes (drafts with no final yet)
- Dated 15 Aug 2017Public notice: Renewable Purchase Obligation and Renewable Energy Certificate Framework Implementation Regulations, 2017 — Public Notice — Draft
- Dated 15 Aug 2017File: Draft RPO Order for Captive Users and Open Access Consumers, FY 2017-18 to FY 2019-20
Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.