Haryana Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff for Generation, Transmission, Wheeling and Distribution & Retail Supply under Multi Year Tariff Framework) Regulations, 2019, 2 nd Amendment Regulations, 2022

AmendmentDated 31 Jan 2022HERC/46/2019/2 nd Amendment/2022 dated The 31st January, 2022

Amends the Terms and Conditions for Determination of Tariff for Generation, Transmission, Wheeling and Distribution & Retail Supply under Multi Year Tariff Framework Regulations, 2019.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on herc.org.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Haryana Electricity Regulatory Commission's second amendment to its 2019 Multi Year Tariff Framework Regulations, notified on 31 January 2022 under section 181 of the Electricity Act 2003 and extending to the whole of Haryana (p1). It comes into force on publication in the Haryana Government Gazette, but no Gazette date is printed (p1).

The amendment reworks the cost and return building blocks used in Haryana tariff orders. It lists the elements that make up the fixed cost of a thermal or hydro generating plant (p1) and restates return on equity as a premium over a "Base Rate" — the two-year average of the 10-year Government of India bond yield as on 1 April — with different caps for hydro, other generators, distribution and transmission businesses, an overall ceiling, an extra allowance for hydro with pondage or pumped storage, and no RoE for the SLDC (p2). Where tariff is determined for a plant's entire useful life, RoE is fixed and normally not revisited (p2). It also changes how interest on working capital, income tax/MAT pass-through, and O&M expenses (with escalation factors) are treated (p2, p12).

Plant-level detail sits in tables: O&M norms in Rs lakh per MW for each named thermal unit across the control-period years (p3); start-up oil consumption by unit size (p4); and auxiliary energy consumption norms for hydro stations by capacity and excitation type (p10). The energy charge rate formula, the "GCV as received" basis for fuel and related disclosure obligations are amended (p3–4).

Regulations 43 and 54.3 are replaced with a self-contained late payment surcharge regime: its application, a base rate, a due date, an escalating surcharge for successive months of default, a cap, adjustment of payments to surcharge first, and debarment of a distribution licensee from power exchange purchases or short-term open access while bills more than seven months overdue remain unpaid (p4–5).

The largest block amends Regulation 35 on hydro plants — defining pumped storage, run-of-river, run-of-river with pondage, storage type and useful life, and setting norms for auxiliary energy consumption, plant availability, design energy and energy-charge shortfall (p5–12). It closes with O&M escalation provisions for the transmission and distribution businesses (p12).

Standard name
Multi Year Tariff Regulations
Primary topics
Tariff determination, Multi Year Tariff (MYT), Return, financing and working capital

Read with this

Voltaic last read HERC's website for final documents on 24 Nov 2026 (2 pages). A document HERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on herc.org.in ↗

Report an issue with this document