Terms & Conditions for Open Access (4th Amendment) Regulations, 2007

Rajasthan Electricity Regulatory Commission (Terms & Conditions for Open Access) (4th Amendment) Regulations, 2007

RegulationDated 30 Mar 2007No.RERC/Secy./Reg. 68 dated 30 March, 2007

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on rerc.rajasthan.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Rajasthan Electricity Regulatory Commission's fourth amendment to its Open Access Regulations, issued at Jaipur on 30 March 2007 under Section 42 read with Section 181 of the Electricity Act 2003. It takes effect from the date of publication in the official gazette, a date the text does not print (p1).

The operative part adds three sub-regulations to Regulation 20 (p1). They split open access consumers into two accounting tracks by contract demand: consumers at 5 MVA and above are accounted and billed on 15-minute time-block meter readings of scheduled versus actual injection and drawal, while those below 5 MVA are handled through ToD-capable interface meters following the mechanism in Appendix-I. Larger consumers may opt into the Appendix-I route after 15 days' notice to the licensee, effective once the required meter is installed. A proviso treats energy accounting and billing already done under the Commission's orders before publication as done under these provisions. Sub-regulation (7) lets the distribution licensee change ToD time zones with two weeks' notice.

Appendix-I (pp2-3) sets out the mechanism itself: weekly meter-reading settlement; splitting each time zone's injection and drawal into two blocks around recorded maximum demand; allocating available injection among multiple consumers and the discom by schedule priority; disallowing injection beyond reserved transmission or distribution capacity; converting available injection into entitled energy after losses; taking open access drawal as the lesser of entitlement and actual drawal; and classifying the imbalance as inadvertent supply to the discom or supply by the discom. It separates regular from stand-by supply during plant shutdowns and prescribes converting monthly rates to weekly rates.

Standard name
Open Access Regulations
Primary topics
Energy accounting and settlement, Open access, Metering

Voltaic last read RERC's website for final documents on 24 Nov 2026. A document RERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on rerc.rajasthan.gov.in ↗

Report an issue with this document