UPERC · Uttar Pradesh Electricity Regulatory Commission
Peer-to-Peer Solar Energy Transaction through Blockchain Based Platform Guidelines
Guidelines for peer-to-peer solar energy transaction through blockchain based platform
GuidelinesDated 5 Apr 2023
Summary
Summary written by software. Check the regulator's original before you rely on it.
These are UPERC guidelines for peer-to-peer (P2P) trading of rooftop solar energy through a blockchain-based platform, issued at Lucknow on 05-04-2023 (p5). They define participants, P2P platform, transaction price, transaction charge and related terms (p1), and state the objective of promoting rooftop solar, efficient asset use and innovative technology (p1).
Sections 2–3 set registration: UPPCL prescribes service-provider registration conditions; service providers register with the distribution licensee for an initial three years (p2). Distribution licensee and service provider jointly publish participant registration forms; only rooftop solar prosumers under the 2019 RSPV metering regulations may register as sellers, and post-paid smart meters are required (p2).
Sections 4–5 cover scope and metering: transactions occur within a distribution licensee’s area, and the service provider uses distribution licensee meter data through MDM to capture and reconcile P2P transactions (p2–3). Scheduling provisions between Sections 5 and 7 set day-ahead and intraday submission cut-offs and bar prosumers from transacting more than their own daily solar generation (p3).
Sections 7–8 set the billing architecture: the distribution licensee bills for total demand, with mutually agreed P2P price, tariff-order energy and demand charges, wheeling and cross-subsidy surcharge, nil additional surcharge, imbalance settlement, and payment-default consequences (p3–4). Section 9 keeps RPO benefits with the distribution licensee (p4). Sections 10–12 allocate rights and responsibilities among participants, service provider and licensee, covering safety, data privacy, system integration, meter defects and outage treatment (p4–5). Sections 13–16 provide for amendment, removal of difficulty, relaxation and dispute redressal through CGRF or the Commission (p5). Annexures 1–6 give sample bills and benefit analyses for prosumer and consumer scenarios, including no imbalance, under/over injection, net metering and net feed-in (p6–12).
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read UPERC's website for final documents on 24 Nov 2026 (2 pages). A document UPERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of UPERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.