APSERC · Arunachal Pradesh State Electricity Regulatory Commission
Standards of Performance for the Distribution Licensee Regulations, 2024
Arunachal Pradesh State Electricity Regulatory Commission (Standards of Performance for the Distribution Licensee) Regulations, 2024
RegulationDated 26 Apr 2024Published in the Gazette 7 May 2024No. APSERC/Notification/43/2024 dated The 26th April, 2024
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Arunachal Pradesh State Electricity Regulatory Commission issued this principal regulation on 26 April 2024; it was gazetted on 7 May 2024 (p1). It replaces the 2016 Standards of Performance for Distribution Licensee Regulations with effect from notification in the official Gazette and applies to all distribution licensees, including deemed licensees under Section 14 of the Electricity Act, and their consumers across Arunachal Pradesh (p1–2).
Regulations 1–3 set title, extent, scope, commencement and definitions (pp1–2). Regulation 4 states the objectives: benchmark reliable distribution service, minimum consumer standards, and a transparent compensation mechanism (pp2–3). Regulation 5 sets out the legal framework, compensation for failure, licensee reporting, annual publication by the Commission, and penalties under Section 142 (p3).
Regulation 6 classifies standards: Schedule-I guaranteed standards differentiated by Municipal & Urban, Rural and Remote areas; failure triggers compensation under Schedule-III; Schedule-II contains overall standards; the Commission may amend the schedules (p3). Regulation 7 details compensation: automatic for Schedule-III parameters within six months, claim-based for other parameters within 30 days, eligibility conditions, half compensation for late payers with delayed payment charges, adjustment in bills, and 45/90-day payment timelines; it also sets consumer-indexing deadlines, audit scope, agency selection, and reliability/accuracy grading that affects recovery of compensation through ARR (pp3–5).
Regulation 8 requires a manual of practice within three months, complaint-handling processes, call centre and help desk rollout, an online compensation facility, a 24x7 toll-free centre, and consumer awareness measures (pp5–6). Regulation 9 requires quarterly reports on guaranteed and overall standards, including capital expenditure projections (pp6–7). Regulation 10 defines power interruption and suspends standards for force majeure, generation/EHV failure, SLDC/NLDC/RLDC-initiated outages, and Commission-approved events (p7). Regulations 11–12 preserve Commission powers to remove difficulties and amend, and consumers' rights under other laws including the Consumer Protection Act, 2019 (p7).
Schedule-I (pp8–12) contains guaranteed restoration and response time tables by complaint type and area. Schedule-II (pp13–16) covers overall standards, percentage achievement targets, load-shedding approval/publication, and reliability indices SAIFI, SAIDI, CAIDI and MAIFI with formulas, automation and DT metering requirements. Schedule-III (pp16–19) contains compensation amounts per service area. Annexures I–III (pp19–25; p20 is not present) give quarterly reporting formats for guaranteed standards, overall standards, faulty meters, reliability indices, and complaint registration.
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read APSERC's website for final documents on 30 Sep 2026 and for drafts on 23 Nov 2026 (2 pages). A document APSERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of APSERC's website on 30 Sep 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.