CERC · Central Electricity Regulatory Commission
Draft Trading Licence Regulations, 2019 — Explanatory Memorandum
Draft Central Electricity Regulatory Commission (Procedure, Terms and Conditions for grant of trading licence and other related matters) Regulations, 2019
Explanatory memorandum to a draftReleased with the notice dated 24 Jul 2019
Draft
The draft has since been finalised as the Procedure, Terms and Conditions for Grant of Trading Licence and Other Related Matters Regulations, 2020.
Explanatory memorandum to the Trading Licence Regulations, 2019 — Draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is CERC's explanatory memorandum to the draft CERC (Procedure, Terms and Conditions for grant of trading licence and other related matters) Regulations, 2019. It explains why the Commission proposes to replace the 2009 trading licence regulations and the 2010 trading margin regulations, and it summarises the draft's main features (p1–2, p11).
The background sets out the 2009 and 2010 instruments and their amendments, notes new procurement routes such as power exchanges and the DEEP portal and expected growth in cross-border trade, and records stakeholder discussions and compliance concerns including inadequate capital adequacy, missing payment security and non-submission of monthly information (p1–2). It states the draft will apply to both prospective and existing trading licensees (p2).
Section 2.1 explains proposed capital adequacy and liquidity requirements: category-wise minimum net worth linked to annual traded-volume bands, an additional net-worth step for Category I above a volume threshold, minimum current and liquidity ratios, and the inclusion of long-term, medium-term, short-term, power-exchange and cross-border transactions in the volume base (p3–4).
Section 2.2 deals with trading margin. It recounts the existing two-slab margin and the price data used to justify removing the slab for short-term and power-exchange contracts, proposing a floor and ceiling instead (p4–5). For long-term contracts it discusses the earlier decision to leave margins uncapped, then proposes escrow or letter-of-credit payment security and a margin cap where that security is not provided; back-to-back arrangements are also proposed to be capped (p5–7).
Section 2.3 covers obligations: a prohibition on diverting or re-selling power already committed to a buyer without consent (p7); payment-security mechanisms for short-term and long-term contracts, including escrow or revolving letter of credit (p7–8); and a proposal to disallow banking of electricity by trading licensees (p9).
Section 2.4 sets out compliance, upgradation and downgradation procedures, including net-worth validation, licence fee for a higher category, a limit on exceeding authorised annual volume, and a bar on seeking upgradation in the same financial year after downgradation (p9–10). Section 3 explains why the changes are treated as a repeal and replacement rather than amendments (p11).
Read with this
The regulation
Amendments and corrections
Commencement notices and reasons
- Dated 2 Jan 2020Trading Licence Regulations, 2020 — Statement of Reasons
- Dated 25 Mar 2020Trading Licence (First Amendment) Regulations, 2020 — Statement of Reasons
Other copies of these documents (2)
Earlier drafts
- Dated 24 Jul 2019Trading Licence Regulations, 2019 — Draft
- Dated 24 Jul 2019Public notice: Trading Licence Grant Procedure and Terms Regulations, 2019 — Public Notice on Draft
- Dated 16 Aug 2019Notice extending the date for comments: Draft Trading Licence Regulations, 2019 — Extension of comment deadline
- Dated 25 Sep 2019Hearing notice: Trading Licence Regulations, 2019 — Public Hearing Notice, 14.10.2019
- Dated 27 Feb 2020Trading Licence (Procedure, Terms and Conditions) (First Amendment) Regulations, 2020 — Draft
- Dated 27 Feb 2020Public notice: Draft Trading Licence (First Amendment) Regulations, 2020 — Public Notice
- Released with the notice dated 27 Feb 2020Explanatory memorandum: Explanatory Memorandum — Draft Trading Licence (First Amendment) Regulations, 2020
One more document belongs here and is not on Voltaic: a draft or notice on a draft not held as English text.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.