RERC · Rajasthan Electricity Regulatory Commission
Battery Energy Storage Systems Regulations, 2026
Rajasthan Electricity Regulatory Commission (Battery Energy Storage Systems) Regulations, 2026
RegulationDated 10 Mar 2026No. RERC/Secy/Reg/164 dated March 10, 2026
Summary
Summary written by software. Check the regulator's original before you rely on it.
The document is the operative text of the Rajasthan Electricity Regulatory Commission (Battery Energy Storage Systems) Regulations, 2026, notified at Jaipur on 10 March 2026 under ss.61, 86 and 181 of the Electricity Act 2003 (p15). The Regulations are technology-neutral for battery storage and apply to licensees, STU, SLDC, generating companies, RE developers, aggregators, BESS service providers, consumers/prosumers and others involved in BESS planning, procurement, deployment, operation or use in Rajasthan (p15). They come into force from Gazette publication; the Gazette date is not printed (p15).
Regulations 1–3 cover commencement, applicability and objectives; definitions in Regulation 2 establish BESS, BESS developer, aggregator/DERA, ancillary services, nodal agency SLDC, round-trip efficiency, standalone BESS and ownership (pp15–16). Regulation 4 permits multiple ownership and business models — co-located, standalone, network-embedded, behind-the-meter and EV/V2G — and addresses legal status, scheduling, metering, telemetry and deviation settlement (pp16–17). Regulation 5 requires distribution licensees and STU, with SLDC, to plan storage, align it with RE policy and resource adequacy, and allows cost recovery through ARR/tariff for regulated network or grid-support BESS; it sets a minimum project size of 1 MW and above with at least two hours at 11 kV or above, with exemptions for DTR-level/behind-meter and a possible shorter duration for co-located ancillary-services BESS (pp17–18).
Regulation 6 sets eligibility and minimum technical requirements for BESS ancillary services and separate accounting; Regulation 7 covers aggregators; Regulation 8 commercial agreements per MoP guidelines; Regulation 9 tariff and market participation, including competitive bidding, consumer/prosumer energy arbitrage, ToD/ToU considerations, single- or multi-part ancillary tariffs, and RPO/RCO treatment of renewable energy stored and discharged (pp18–20). Regulations 10–13 cover technical standards, safety/cyber/environmental norms, roles of licensees and SLDC — including deadlines for eligibility criteria and procedures — and registration of AS providers (pp20–22). Regulations 14–18 cover generators/IPPs/CPPs/BESS developers, consumers/prosumers, open access, dispute resolution and savings/transition (pp22–23). Regulations 19–22 provide powers to direct, remove difficulties, relax and amend (p23). The Regulations leave several settlement, tariff-incentive and operational details to separate Commission orders or SLDC procedures.
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read RERC's website for final documents on 24 Nov 2026. A document RERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of RERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.