AERC · Assam Electricity Regulatory Commission
RE Tariff Determination Regulations, 2017
AERC RE Tariff Determination Regulations, 2017 (10 Apr 2017 row)
RegulationDated 4 Oct 2017Published in the Gazette 12 Oct 2017
Replaced by Terms and Conditions for Tariff Determination from Renewable Energy Sources Regulations, 2024
See that regulation for the date it took effect and for anything it keeps in force.
Summary
Summary written by software. Check the regulator's original before you rely on it.
Assam Electricity Regulatory Commission issued this principal regulation on 4 October 2017; it was published in the Assam Gazette on 12 October 2017 and comes into force from that publication (p1). It governs how AERC determines tariffs under section 62 of the Electricity Act for renewable energy generating stations in Assam, and it applies statewide (p1, p5).
Regulations 3–4 set the scope and technology eligibility criteria: wind, small hydro up to and including 25 MW, biomass Rankine, non-fossil cogeneration, solar PV and solar thermal, biomass gasifier, biogas and MSW/RDF projects must meet specified new-plant, site-approval and fuel/technology conditions (p5–6). Regulations 5–11 create the tariff framework: a three-year control period starting with FY 2017-18; tariff periods equal to each technology's useful life; a project-specific tariff track for solar, wind, MSW/RDF, hybrids and new MNRE-approved technologies, for which no annual generic tariff will be determined; petition contents and forms; single-part or two-part tariff structures; levellisation principles; and must-run/despatch treatment (p7–9).
Regulations 12–24 lay down the common financial and commercial norms — capital cost, debt-equity, loan tenure and interest, depreciation, return on equity, working capital, CUF/PLF calculation, O&M escalation, rebate, late-payment surcharge, CDM benefit sharing, subsidy/incentive treatment and taxes (p10–12). The technology chapters then specify the operating and cost parameters for wind (p13), small hydro (p14), biomass Rankine (p15–16), non-fossil cogeneration (p17–18), solar PV (p19), solar thermal (p20), biomass gasifier (p21), biogas (p22) and MSW/RDF (p23). Depending on technology, these cover capital cost, PLF/CUF, auxiliary consumption, heat rate or specific fuel consumption, fuel mix and fossil-fuel limits, calorific value, fuel price escalation and O&M.
Regulations 84–88 allow tariff by agreement within the norms and give the Commission powers to relax, issue directions, amend and interpret (p24). The Appendix provides four petition and tariff-computation forms for different RE technologies (p25–30).
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read AERC's website for final documents on 30 Sep 2026. A document AERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.