CSERC · Chhattisgarh State Electricity Regulatory Commission
SLDC Fees and Charges Regulations, 2012
Chhattisgarh State Electricity Regulatory Commission (Fees and charges of State Load Despatch Centre and other related matters) Regulations, 2012
RegulationDated 29 Dec 2012No.45/CSERC/2012 dated December 29, 2012
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is CSERC's principal regulation fixing how the Chhattisgarh State Load Despatch Centre (SLDC) is funded — the fees it may levy and the charges it may collect from grid users — for the three-year control period running from 1 April 2013 to 31 March 2016, continuing until superseded (p1–2).
Chapter 1 (p5–8) sets the procedural spine: SLDC must petition the Commission by 30 November in Commission-approved formats for determination of fees and charges, backed by an audited and audited-projected CAPEX plan, with service of the petition on long-term intra-State entities, website publication, newspaper notice and an affidavit. It also establishes an annual truing-up cycle, with over- or under-recovery adjusted in the following year's determination. The chapter then defines how capital cost is built up, how additional capitalisation is admitted, how the debt:equity ratio is treated, and what happens to the old SLDC Development Fund and to SLDC's non-tariff income.
Chapter 2 (p9–12) is the computation engine: the annual revenue requirement is broken into six components — return on equity, interest on loan, depreciation, O&M, interest on working capital and pension fund — with a stated method for each, including normalisation and inflation-escalation of O&M, grossing up of the return on equity for tax, normative loan and refinancing-sharing rules, and the depreciation value base.
Chapter 3 (p13–16) deals with levy and collection: it splits annual charges between the state system operation function and the intra-State market operation function, and allocates the burden among intra-State transmission licensees, sellers and buyers, with explicit carve-outs for renewable generators, bulk consumers, captive users and short-term open access customers. It also sets out registration with SLDC, the application process and the fee structure, and the ten-year validity of registration.
Chapter 4 (p17) covers monthly billing, late payment surcharge, rebate, the Commission's power to relax, and savings clauses. Appendix-I (p18–19) is the depreciable-asset rate schedule; Appendix-II (p20–21) is the registration application format.
Read with this
No other documents to read with it are on Voltaic.
One more document belongs here and is not on Voltaic: a copy in another language.
Voltaic last read CSERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document CSERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of CSERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.