KERC · Karnataka Electricity Regulatory Commission
SLDC Fee and Charges Regulations, 2004
Karnataka Electricity Regulatory Commission (Levy and Collection of Fee and Charges by State Load Despatch Centre) Regulations-2004
RegulationDated 7 Jul 2004Published in the Gazette 18 Nov 2004B/13/3 dated 7th July 2004
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is KERC's principal regulation for how Karnataka's State Load Despatch Centre recovers its costs from the entities it despatch-monitors. It was issued by notification dated 7 July 2004 and published in the Karnataka Gazette on 18 November 2004 (p1), but it does not start on either date: it takes effect from the day the Government of Karnataka establishes the SLDC under s.31(1) of the Electricity Act (p2). The preamble explains the statutory setting — SLDC as the apex body for integrated state power-system operation, with KPTCL acting as STU until a government company is notified (p1).
Chapter I sets the title, statewide extent and scope, and exempts generating stations up to and including 5MW installed capacity (p1–2). Chapter II defines the working vocabulary — Act, billing month, financial year, intra-state transmission system, KER Act 1999, SLDC, STU, transmission licensee — with the Electricity Act prevailing over the KER Act on inconsistency (p2).
Chapter III is the operative core: it requires SLDC expenses to be accounted separately and recovered from despatch-monitored generating stations and transmission licensees, requires new and existing entities to register with SLDC on application with a fee, and lists the cost heads that feed SLDC charges. It sets the allocation basis — charges first divided equally between generators and transmission licensees, then to individual stations by installed capacity and to licensees by MW-kilometres of network — with the annual computation done per Annexure-1 (p2–3).
Chapter IV lays out the annual revenue requirement (ARR) filing cycle: SLDC files its ARR and allocation four months before the financial year in the prescribed Annexure formats, seeks prior Commission approval for capital projects above a threshold, files as a petition in six sets, and faces Commission scrutiny, information calls, audit of records and orders. It also fixes when charges may be revised and how under- or over-recovery is carried forward (p3–5).
Chapter V covers monthly billing and collection — billing cycle, payment deadline, penal interest for late payment, first-charge priority of SLDC dues, and a two-stage dispute route ending at the Commission, with most of the bill payable under protest while a dispute runs (p5–6). Chapter VI preserves the Commission's overriding and residual powers to vary procedure or decide matters not covered by these regulations (p6).
Read with this
No other documents to read with it are on Voltaic.
One more document belongs here and is not on Voltaic: a procedure or order made under it not held as English text.
Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of KERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.