KSERC · Kerala State Electricity Regulatory Commission
Furnishing of Technical details by the Generating Companies Regulations, 2010
Kerala State Electricity Regulatory Commission (Furnishing of Technical details by the Generating Companies) Regulations, 2010
Regulation · Gazette copyDated 21 Dec 2010Published in the Gazette 7 Jan 2011No. 2158/CT/2010/KSERC. dated 21st December, 2010
The Gazette copy of the Furnishing of Technical Details by the Generating Companies Regulations, 2010.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Kerala State Electricity Regulatory Commission issued this notification (No. 2158/CT/2010/KSERC, dated 21 December 2010) to make the KSERC (Furnishing of Technical details by the Generating Companies) Regulations, 2010. It was published in the Kerala Gazette Extraordinary on 7 January 2011 (p1). The regulations are made under Section 181 read with Section 10(3) of the Electricity Act, 2003 after previous publication.
Regulation 1 gives the short title and says the regulations come into force from the date of publication in the Official Gazette (p1). Regulation 2 requires every generating company operating, or setting up, a generating station referred to in Section 86(1)(a) or (b) of the Act to furnish up-to-date technical details to the Commission. The details must be given in Form A, B or C as applicable to the station type, separately for each stage of the station, showing status as on 1 April and submitted by 30 April every year, with a soft copy (p1). A generating company proposing a new station must file its first report at least three years before the projected commercial operation date of the first unit (p1).
The bulk of the document is the three appended forms. Form A (p2–4) lists the technical particulars to be filed for coal/lignite-fired thermal stations, covering ownership, capacity, commercial operation dates, beneficiaries, transmission evacuation, manufacturers, fuel and calorific values, steam parameters, design fuel, heat rate, boiler efficiency, cooling and feed pumps. Form B (p5–7) does the same for gas, liquid-fuel and diesel stations, with combined-cycle and open-cycle heat rates and site ambient conditions. Form C (p8–9) covers hydro stations, including design energy, head, reservoir levels, silt levels and turbine efficiency. Each form has notes requiring a soft copy and adopting definitions of beneficiary, installed capacity, merchant capacity, target beneficiary and design energy from the CERC (Terms and Conditions of Tariff) Regulations, 2009.
Read with this
The regulation
Voltaic last read KSERC's website for final documents on 24 Nov 2026. A document KSERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.