CERC · Central Electricity Regulatory Commission
Regulation of Power Supply Regulations, 2010 — Repeal Notification, 2021
Notification, Repeal
RegulationDated 26 Oct 2021No. L-1/42/2010-CERC dated 26.10.2021
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a one-page CERC notification (No. L-1/42/2010-CERC, dated 26.10.2021) that removes an existing regulatory framework rather than creating one. Made under Section 178 of the Electricity Act, 2003, it repeals with immediate effect the Central Electricity Regulatory Commission (Regulation of Power Supply) Regulations, 2010 and the Central Electricity Regulatory Commission (Regulation of Power Supply) (First Amendment) Regulations, 2021 (p1).
The repeal is not absolute. Paragraph 3 saves any Implementation Plan already under implementation by a Regional Load Despatch Centre or State Load Despatch Centre on the date of the notification; such a plan runs its normal course under the repealed regulations (p1).
A closing Note gives the Gazette traceability for the instruments being repealed — the 2010 Regulations, the 2011 corrigendum to them, and the 2021 First Amendment (p1). The notification does not reproduce the repealed provisions, name a successor framework, or set any transition deadline beyond the savings clause.
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of CERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.