APERC · Andhra Pradesh Electricity Regulatory Commission

Reorganisation Regulation, 2014

Andhra Pradesh Electricity Regulatory Commission (Reorganisation) Regulation, 2014

RegulationDated 26 May 2014Published in the Gazette 26 May 2014In force from 2 Jun 2014Regulation No.3 of 2014 dated 26-05-2014

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on aperc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a short transitional regulation made by the undivided Andhra Pradesh Electricity Regulatory Commission to keep the electricity regulatory framework working across the two successor States created by the Andhra Pradesh Reorganisation Act, 2014. Page 1 sets out the background: APERC's constitution and statewide jurisdiction, the 1 March 2014 notification of the Reorganisation Act, the 2 June 2014 Appointed Day on which Telangana and Andhra Pradesh come into existence, and the requirement under s.92 read with the Twelfth Schedule that the existing Commission serve as a joint regulatory body for a limited period. The Regulation was previously published on 7 May 2014 and made after considering suggestions.

The operative text is five clauses on page 2. Clause 1 gives the short title and brings the Regulation into force on 2 June 2014. Clause 2 specifies that APERC acts as joint regulator for both States for six months or until separate SERCs begin functioning. Clause 3 continues every APERC regulation, supplementary regulation, amendment, rule, order, proceeding, guideline, memo and notification issued before 2 June 2014 across both States until altered, repealed or amended by the respective State Commissions. Clause 4 freezes the transmission area of APTRANSCO as it stood immediately before that date, pending notification of separate State Transmission Utilities. Clause 5 deems the supply areas of existing distribution and retail supply licensees reassigned in line with the Reorganisation Act, until amended or until separate licences are issued. The Regulation is signed by the Commission Secretary and is not a tariff or technical instrument: its value is purely as the continuity bridge between one regulator and two States.

Read with this

No other documents to read with it are on Voltaic.

Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of APERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.