APSERC · Arunachal Pradesh State Electricity Regulatory Commission
Power Purchase and Procurement Process of Licensee Regulations, 2024
Arunachal Pradesh State Electricity Regulatory Commission (Power Purchase and Procurement Process of Licensee) Regulation, 2024
RegulationDated 16 Apr 2024Published in the Gazette 7 May 2024No. APSERC/Notification/42/2024 dated The 16th April, 2024
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Arunachal Pradesh State Electricity Regulatory Commission issued this regulation on 16 April 2024 (notification No. APSERC/Notification/42/2024) to govern how distribution licensees in the state forecast, plan, procure and obtain approval for power purchases. It was published in the Arunachal Pradesh Gazette (Extraordinary) on 7 May 2024 and comes into force from that publication (p1).
Regulations 1–2 set the title, statewide extent, commencement and definitions, including the dividing line between short-term (up to one year) and long-term (over one year) procurement and the meaning of "procurer" (p1–2). Regulation 3 lists the four activities the regulation covers — demand and availability forecasting, formulating the procurement plan, procuring against the approved plan, and procuring beyond it — and applies them to all inter-state and intra-state purchases by licensees in Arunachal Pradesh (p2).
Regulations 4–5 prescribe how licensees assess demand (MW) and energy (MU) for peak and off-peak periods, month by month, over one-year and ten-year horizons, and how they assess availability from own, central-sector, renewable, banking and other sources. Both are anchored to latest CEA Electric Power Survey methodology; the availability assessment gives source-specific criteria for hydro, thermal, gas, nuclear and renewable plants and for inter-state and intra-state transmission losses (p2–4).
Regulation 6 requires a rolling ten-year long-term plan and an annual, month-wise short-term plan, both on merit-order and least-cost principles, with three years of historical data annexures and integration with the ARR (p4–5). Regulations 7–8 set the route for additional power beyond the approved plan and for Commission approval, with public consultation at the Commission's discretion (p5–6).
Regulations 9–11 fix the criterion for purchases (least cost, consultation with system and government bodies, reactive-power handling), the procurement procedure for short-term and long-term power — transparent open competitive bidding under the Ministry of Power bidding guidelines, with power exchange or banking for urgent needs and prior approval for deviations — and the grounds on which new or amended PPAs are evaluated and approved (p6–7). Regulation 12 limits Commission intervention once procurement has begun, and Regulation 13 gives the Commission power to remove difficulties and to amend (p8).
Read with this
No other documents to read with it are on Voltaic.
2 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft.
Voltaic last read APSERC's website for final documents on 30 Sep 2026 and for drafts on 23 Nov 2026 (2 pages). A document APSERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of APSERC's website on 30 Sep 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.