Skip to content

PSERC · Punjab State Electricity Regulatory Commission

Forum and Ombudsman Regulations, 2016 — 2nd Amendment, 2021 — Order

PSERC (FORUM & OMBUDSMAN) (2ND AMENDMENT) REGULATIONS, 2021

OrderDated 24 Aug 2021

Made under the Forum and Ombudsman Regulations, 2016.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on pserc.punjab.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is PSERC's order dated 24.08.2021 disposing stakeholder comments on the draft PSERC (Forum & Ombudsman) (2nd Amendment) Regulations, 2021 and approving the amendment with modifications. It is not the amended regulation text; the operative changes are recorded as regulation-wise decisions and would take effect on notification (p15).

Pages 1–2 set out the background: Section 42(5) and Rule 7 require a consumer grievance forum; the 2005 regulations were replaced by the 2016 regulations; the 2013 CCHP created Dispute Settlement Committees; and the Electricity (Rights of Consumers) Rules, 2020, Rule 15, prompted the draft. The draft was circulated for comments by 02.08.2021 and a public hearing was held on 04.08.2021, with objections/comments received (p1–2).

Pages 2–14 record comments and the Commission's analysis and decisions. Accepted changes include rewording the Prosumer definition and inserting it as Regulation 1.5(o) (p2); adding a commercial-wing permanent invitee to the Corporate Forum and renumbering clauses (p3); specifying the Secretary's rank (p4); changing Zonal, Circle and Divisional Forum composition and adding consumer/prosumer Special Invitees (p5–8); amending quorum and voting so Special Invitees have no vote (p11); and rewording Ombudsman provisions on injunctions and record-calling powers (p13–14). Suggestions rejected include reducing tenure/service-left requirements, increasing monetary jurisdiction limits or appeal periods, requiring an additional appeal deposit, longer disposal periods, and changing Grade-1 to Group-A (p3–14). Monetary limits and the 45-day disposal period are retained (p10–12). The order ends with approval by the Chairperson and Members (p15).

Standard name
CGRF and Ombudsman
Primary topics
Consumer grievance redressal (CGRF), Electricity ombudsman, Consumer representation

Read with this

Voltaic last read PSERC's website for final documents on 26 Nov 2026. A document PSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on pserc.punjab.gov.in ↗

Report an issue with this document