GERC · Gujarat Electricity Regulatory Commission
Procedure for Previous Publication of Regulations under Section 181 of the Electricity Act, 2003 — Order, 2005
Gujarat Electricity Regulatory Commission (Procedure for previous publication of regulations to bemade under section 181 of the Electricity Act,2003) Order
OrderDated 2 Aug 20051/2005
Summary
Summary written by software. Check the regulator's original before you rely on it.
GERC's Order 1/2005 is a short procedural instrument that tells the Commission itself how it will consult before making regulations. It opens from the premise that s.181 of the Electricity Act 2003 requires state commissions to publish regulations 'previously' but does not define how, and that the Central Government's Electricity (Procedure for previous publication) Rules, 2005 leave the manner to the Commission's own judgment (p1). Paragraph 1 names the order and brings it into force immediately (p1).
Paragraph 2 sets out the consultation route: a notice in at least two widely circulated Gujarati newspapers and one widely circulated English local newspaper inviting objections, suggestions and comments; the draft regulation placed on the Commission's website and available in its office library; copies to the Energy and Petrochemicals Department, all State Advisory Committee members and all licensees; a comment period of two weeks or more as the Commission considers necessary; and consideration of the responses received, with a public hearing possible in exceptional cases (p1–2).
Paragraph 3 deals with what happens after approval — notification in the official gazette, which is conclusive proof that the regulations have been duly made, plus website posting, notice-board intimation and a press note for the general public (p2–3). Paragraph 4 shields regulations made before the 2005 Rules came into force from being invalidated for non-compliance with the new procedure (p3).
Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.