Skip to content

GERC · Gujarat Electricity Regulatory Commission

Procedure for Previous Publication of Regulations under Section 181 of the Electricity Act, 2003 — Order, 2005

Gujarat Electricity Regulatory Commission (Procedure for previous publication of regulations to bemade under section 181 of the Electricity Act,2003) Order

OrderDated 2 Aug 20051/2005

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

GERC's Order 1/2005 is a short procedural instrument that tells the Commission itself how it will consult before making regulations. It opens from the premise that s.181 of the Electricity Act 2003 requires state commissions to publish regulations 'previously' but does not define how, and that the Central Government's Electricity (Procedure for previous publication) Rules, 2005 leave the manner to the Commission's own judgment (p1). Paragraph 1 names the order and brings it into force immediately (p1).

Paragraph 2 sets out the consultation route: a notice in at least two widely circulated Gujarati newspapers and one widely circulated English local newspaper inviting objections, suggestions and comments; the draft regulation placed on the Commission's website and available in its office library; copies to the Energy and Petrochemicals Department, all State Advisory Committee members and all licensees; a comment period of two weeks or more as the Commission considers necessary; and consideration of the responses received, with a public hearing possible in exceptional cases (p1–2).

Paragraph 3 deals with what happens after approval — notification in the official gazette, which is conclusive proof that the regulations have been duly made, plus website posting, notice-board intimation and a press note for the general public (p2–3). Paragraph 4 shields regulations made before the 2005 Rules came into force from being invalidated for non-compliance with the new procedure (p3).

Primary topics
Consumer representation

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗

Report an issue with this document