UERC · Uttarakhand Electricity Regulatory Commission
Electricity Supply Code, Release of New Connections and Related Matters Regulations, 2020
Uttarakhand Electricity Regulatory Commission (The Electricity Supply Code, Release of New Connections and Related Matters) Regulations, 2020
RegulationDated 29 Oct 2020No.F-9(31)/RG/UERC/2020/814 dated October 29, 2020
Summary
Summary written by software, from pages 1 to 36 of 148. Check the regulator's original before you rely on it.
The UERC (The Electricity Supply Code, Release of New Connections and Related Matters) Regulations, 2020 is a principal regulation notified by the Uttarakhand Electricity Regulatory Commission on 29 October 2020 under the Electricity Act 2003 and the Electricity (Removal of Difficulties) Order, 2005 (p1). It applies to all distribution and retail supply licensees, including deemed licensees, and to consumers in Uttarakhand, as well as persons exempted under Section 13 (p3). It comes into force on Gazette publication and replaces the 2007 Supply Code and the 2008 and 2013 connection regulations.
Pages 1–2 are a contents/arrangement list: eight chapters plus forms and annexures. Chapter 1 (pp3–9) sets scope, commencement, interpretation and definitions. Chapter 2 (pp10–11) classifies supply by declared voltage and contracted load bands, specifies voltage variation limits, load-rounding and a classification table. It lays down general conditions for new connections — website disclosure, hard and online applications, prepaid metering options, no-dues certificates, treatment of sub-divided premises, demolition-and-reconstruction cases, record-keeping, PTW limits and complaint routes (pp12–16). It then details temporary connections: Tatkal Sewa, application forms and documents, processing timelines, consumption and material security, extension and postponement, refunds, and conversion of temporary construction connections into permanent ones (pp16–23). It sets out LT connection conditions by load and distance from the distributing main, including HVDS, service-line and line-extension charges, application documents, processing timelines, deemed sanction, and delay penalties/compensation (pp24–35). At p35 it begins HT/EHT connection conditions, covering independent feeders and metering CT/PT requirements (pp35–36).
The later chapters are not in the supplied extract, but the contents list says they cover existing connections, metering and billing, disconnection and reconnection, unauthorised use and theft, and savings (p2). Annexures are referenced throughout for application formats, inspection/test records, developer load norms and monthly delay reporting (pp16, 19, 26, 29, 31, 34).
Read with this
No other documents to read with it are on Voltaic.
One more document belongs here and is not on Voltaic: a copy in another language.
Voltaic last read UERC's website for final documents on 24 Nov 2026. A document UERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of UERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.