UERC · Uttarakhand Electricity Regulatory Commission

Electricity Supply Code, Release of New Connections and Related Matters Regulations, 2020

Uttarakhand Electricity Regulatory Commission (The Electricity Supply Code, Release of New Connections and Related Matters) Regulations, 2020

RegulationDated 29 Oct 2020No.F-9(31)/RG/UERC/2020/814 dated October 29, 2020

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cdnbbsr.s3waas.gov.in ↗

Summary

Summary written by software, from pages 1 to 36 of 148. Check the regulator's original before you rely on it.

The UERC (The Electricity Supply Code, Release of New Connections and Related Matters) Regulations, 2020 is a principal regulation notified by the Uttarakhand Electricity Regulatory Commission on 29 October 2020 under the Electricity Act 2003 and the Electricity (Removal of Difficulties) Order, 2005 (p1). It applies to all distribution and retail supply licensees, including deemed licensees, and to consumers in Uttarakhand, as well as persons exempted under Section 13 (p3). It comes into force on Gazette publication and replaces the 2007 Supply Code and the 2008 and 2013 connection regulations.

Pages 1–2 are a contents/arrangement list: eight chapters plus forms and annexures. Chapter 1 (pp3–9) sets scope, commencement, interpretation and definitions. Chapter 2 (pp10–11) classifies supply by declared voltage and contracted load bands, specifies voltage variation limits, load-rounding and a classification table. It lays down general conditions for new connections — website disclosure, hard and online applications, prepaid metering options, no-dues certificates, treatment of sub-divided premises, demolition-and-reconstruction cases, record-keeping, PTW limits and complaint routes (pp12–16). It then details temporary connections: Tatkal Sewa, application forms and documents, processing timelines, consumption and material security, extension and postponement, refunds, and conversion of temporary construction connections into permanent ones (pp16–23). It sets out LT connection conditions by load and distance from the distributing main, including HVDS, service-line and line-extension charges, application documents, processing timelines, deemed sanction, and delay penalties/compensation (pp24–35). At p35 it begins HT/EHT connection conditions, covering independent feeders and metering CT/PT requirements (pp35–36).

The later chapters are not in the supplied extract, but the contents list says they cover existing connections, metering and billing, disconnection and reconnection, unauthorised use and theft, and savings (p2). Annexures are referenced throughout for application formats, inspection/test records, developer load norms and monthly delay reporting (pp16, 19, 26, 29, 31, 34).

Standard name
Electricity Supply Code
Primary topics
New connections and load changes, Connection and miscellaneous charges, Conditions of supply

Read with this

No other documents to read with it are on Voltaic.

One more document belongs here and is not on Voltaic: a copy in another language.

Voltaic last read UERC's website for final documents on 24 Nov 2026. A document UERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of UERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cdnbbsr.s3waas.gov.in ↗

Report an issue with this document