Skip to content

KSERC · Kerala State Electricity Regulatory Commission

Connectivity and Intra-state Open Access Regulations, 2013

Kerala State Electricity Regulatory Commission (Connectivity and Intra-state Open Access) Regulations, 2013

RegulationDated 10 Sep 2013No. 1824/CT/KSERC/2012 dated 10th September, 2013

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on dev.erckerala.org ↗

Summary

Summary written by software, from pages 1 to 31 of 72. Check the regulator's original before you rely on it.

The KSERC notification No. 1824/CT/KSERC/2012, dated 10 September 2013, makes the Kerala State Electricity Regulatory Commission (Connectivity and Intra-state Open Access) Regulations, 2013 under section 181 of the Electricity Act, 2003. They extend to the whole State of Kerala and come into force from the date of publication in the Kerala Government Gazette. Scope covers connectivity and open access on the intra-state transmission and distribution systems, including where those systems are used together with the inter-state system (p1).

Chapter I is formal (p1). Chapter II defines forty terms that carry the operative machinery — allotted and reserved capacity, the long/medium/short-term open access periods, embedded and limited short-term open access consumers, stranded transmission and distribution capacity, wheeling, imbalance and the nodal agency (p1–5).

Chapter III sets the connectivity gate: consumers above 12 MVA contracted load and generating stations above 12 MW connect to the intra-state transmission system; those at or below that level connect to the distribution system, with provisos allowing a different voltage where the specified level is unavailable and preserving existing connections (p5). It then lays out application, feasibility study, the disposal clock, who bears the cost of dedicated lines and system augmentation, connection and tripartite agreements, lapse of unaccepted offers, permission to inject infirm power during testing, and an exit option in which relinquishment or transfer needs prior approval and case-by-case compensation (p5–13). Connectivity to distribution systems for generating stations is mirrored separately, and connectivity for non-generators follows the State Supply Code (p13).

Chapter IV is the core. It classifies open access customers by system, location and duration, lists who is eligible and who is barred for unpaid dues, requires meters and remote terminal units before grant, preserves pre-existing wheeling contracts, sets criteria and a formula-based method for computing available capacity with monthly website publication, and prescribes the application route through the nodal agency with bank guarantee (p13–20). Long-term, medium-term and short-term procedures follow, including advance scheduling windows, day-ahead open access, an electronic bidding mechanism where demand exceeds capacity or congestion is expected, and rules on cancelling or revising schedules (p20–27). Generating stations connected to distribution systems, and traders, distribution licensees and STU-connected generators, are handled at the end (p27–28).

Chapters V and VI (p28–31) create two bespoke customer classes: limited short-term open access customers, who take open access only during pre-scheduled load shedding and are exempt from wheeling, cross-subsidy and additional surcharge while paying operating charges; and embedded open access consumers, who keep their supply agreement, pay the full charge set, and get time-of-day relief on open access energy. Later parts — Chapter VIII on charges, Chapter X on the co-ordination committee, the Schedule and regulations 42 and 46.

Standard name
Connectivity and GNA Regulations, Open Access Regulations
Primary topics
Open access, Connectivity and GNA, Scheduling and despatch

Read with this

No other documents to read with it are on Voltaic.

One more document belongs here and is not on Voltaic: a copy in another language.

Voltaic last read KSERC's website for final documents on 24 Nov 2026. A document KSERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of KSERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on dev.erckerala.org ↗

Report an issue with this document